In assortment of dams in drainage channels, what are the main advantages of using rubber dams instead of steel-gate dams?

Answer

Key Advantages of rubber dams are as follows-
(i) As rubber is bendable in nature it is capable of performing depression even in presence of dirt and sedimentation on downstream side. Though, for rigid steel-gate dams, it might not be possible to open when there is extreme sediment.

(ii) As foundation of rubber dams is reasonably lighter than that of steel-gate dams, it saves both construction price and occasion.

(iii) Rubber dams are able to be planned with longer spans without piers as steel-gate dams require intermediate piers for long spans.

 

 


Related Discussions:- Main advantages of using rubber dams

Define the thiem equations for confined aquifers, Define the Thiem Equation...

Define the Thiem Equations for Confined Aquifers   Using natural log:  Q = 2pKm(h 2 - h 1 )/ln(r 2 /r 1 )   Using log 10 :    Q = 2Km(h 2 - h 1 )/((1055)log(r 2 /r 1 ))

Show the silt curtain touching seabed, Q. Show the Silt curtain touching se...

Q. Show the Silt curtain touching seabed? Silt curtains are impermeable vertical barriers extending from seawater surface to their designed depths. Curtains are held in a verti

Levelling procedure, how to carry on leveling using dumpy level????????????...

how to carry on leveling using dumpy level????????????

Define the crash rate for intersection, An intersection has a total enterin...

An intersection has a total entering traffic volume of 42,000 vehicles per day.  During the past three years, there have been a total of 35 reported intersection-related crashes.

How can a temporary diversion to laid, Q. How can a temporary diversion to ...

Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion

Calcculate the material costs, A capital improvement project requires the i...

A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts space

Hazard, • A potential source of harm - Mechanical hazard - Electrical...

• A potential source of harm - Mechanical hazard - Electrical hazard - Cutting hazard - Toxic hazard - Fire hazard - Explosion hazard

State the short-term deflections, State the short-term deflections If  ...

State the short-term deflections If  short-term deflections are considered, the instantaneous deflection due to design loads may be calculated using elastic analysis based on t

Design of a weir, how do you design a weir - broad crested shape

how do you design a weir - broad crested shape

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd