1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KNm at A.Determine:
a. The reaction at A and C
b. Draw shear force and BM diagrams
c. Slope at A
d. Slope and deflection at B

Take E=200kn/mm square
I = 270x10 to the power 6

Related Discussions:- deflection of beams

Define the pressure on a vertical plane, Define the Pressure on a vertical ...

Define the Pressure on a vertical plane Fluid pressure increases linearly with increasing depth. The average pressure on a vertical plane occurs at the average vertical depth.

Define the degree of saturation and soil moisture content, Establish the r...

Establish the relationship among degree of saturation, soil moisture content, definite gravity of soil particles, and void ratio. The volume of an undisturbed clay sample having

Cost-volume relationship, Cost-volume relationship: Cost-volume relati...

Cost-volume relationship: Cost-volume relationship is illustrated through a simple example dealing with the cost of operating an automobile. To perform the analysis following

Theory of elasticity and plasticity, derivation for strain energy stored in...

derivation for strain energy stored in a body due to torsion

Prismatic compass, Figure, working,principle of prismatic compass

Figure, working,principle of prismatic compass

Drainage of embankment slopes, Drainage of Embankment Slopes: Slopes ...

Drainage of Embankment Slopes: Slopes of high embankments get eroded by rain water. Deep rain cuts are formed, which endanger the pavement. In such cases, it is customary to

State the term axial prestressingin - Concrete, State the term Axial Prestr...

State the term Axial Prestressingin Concrete If the centroid of cross-sectional areas of tendons is at the location of the centroid of the cross-section of the concrete member,

Design of prestressed concrete pipes, Design of prestressed concrete pipes ...

Design of prestressed concrete pipes The design of prestressed concrete pipes should cover the following five stages : (a) Circumferential prestressing, winding with or wit

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd