1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KNm at A.Determine:
a. The reaction at A and C
b. Draw shear force and BM diagrams
c. Slope at A
d. Slope and deflection at B

Take E=200kn/mm square
I = 270x10 to the power 6

Related Discussions:- deflection of beams

Biological wastewater engineering, a. We put a lot of time and effort into ...

a. We put a lot of time and effort into cultivating our activated sludge microbial community. So why do we waste sludge out of it? b. A wastewater discharges to Puget sound, a mari

Explain working of ultrasonic system for concrete elements, Explain the wor...

Explain the working of Ultrasonic System for Concrete Elements? Ultrasonic methods can be used underwater for overall assessment of the strength of concrete based on sound velo

Define hammer efficiency and coefficient of restitution, Q. Define Hammer e...

Q. Define Hammer efficiency and coefficient of restitution? Hammer efficiency refers to ratio of kinetic energy of hammer to the rated energy (or potential energy). Basically i

Explain the cross sectional area of flow, Cross-sectional area of flow (ft ...

Cross-sectional area of flow (ft 2 ) (A) For rectangular channels = (w)(d). For trapezoidal channels, divide the flow area into two side triangles and one center rectangle, so

Leveling., what is the errors faced in leveling

what is the errors faced in leveling

Present worth of an infinite series of annual amount, The construction of a...

The construction of a new bakery requires the property development firm to pay the municipality the cost to expand its sewage treatment plant. In addition to the expansion costs, t

Chemical analysis of fe 415., in this chemical analysis what is the meaning...

in this chemical analysis what is the meaning of c% and s% and P%

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd