deflection of beams, Civil Engineering

Assignment Help:
1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KNm at A.Determine:
a. The reaction at A and C
b. Draw shear force and BM diagrams
c. Slope at A
d. Slope and deflection at B

Take E=200kn/mm square
I = 270x10 to the power 6

Related Discussions:- deflection of beams

Choice of pavement - road pavements, Choice of Pavement: The advantag...

Choice of Pavement: The advantages and drawback of the two types of pavements are summarized in Table, to enable a choice to be made. Table : Advantages and drawback of

Shear force, Shear distribution for I section

Shear distribution for I section

Airport lighting, Airport Lighting: Lighting of Approach to Runway ...

Airport Lighting: Lighting of Approach to Runway A good system of identification of the runway when landing is to provide six transverse cross-bars of lights placed a

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Structural analysis & design, This is an optional team assignment. This gra...

This is an optional team assignment. This grade will replace your lowest two homework grades. You may work in teams of 3-4 students. Design the lightest concrete cantilever beam

Define the hazard ranking system (hrs), Define the Hazard Ranking system (H...

Define the Hazard Ranking system (HRS) - A procedure for ranking uncontrolled hazardous waste sites in terms of the potential threat based upon the containment of the route of

Potential advantages of segmental tunnelling, Q. Potential advantages of se...

Q. Potential advantages of segmental tunnelling when compared with hand-shield pipe-jacking? In segmental tunnelling, jacks are installed at the shield so that itisn't necessar

Engeneering surveying, demonstrate your understanding of the term setting o...

demonstrate your understanding of the term setting out

Doors and windows, important considerations in case doors and windows

important considerations in case doors and windows

Highway Engineering, I am a Civil Engg student. Why CBR Values determined ...

I am a Civil Engg student. Why CBR Values determined only at 2.5 and 5 mm penetration ?.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd