Verify the net allowable bearing pressure, Civil Engineering

Assignment Help:

A 1.8 m square column is founded at a depth of 1.8 m in sand, for which the accurate N-value is 24. The water table is at a detph of 2.7 m.

Verify the net allowable bearing pressure for a permissible settlement of 40 mm and a factor of safety of 3 against shear failure.

 


Related Discussions:- Verify the net allowable bearing pressure

Mechanics, How to prove varignon theorem in easiest way

How to prove varignon theorem in easiest way

Irrigation, what is a balancing depth

what is a balancing depth

Concrete, whats the role of gypsum in concrete?

whats the role of gypsum in concrete?

Determine the variation of safe bearing capacity of soi, State the algebrai...

State the algebraic equations showing the variation of safe bearing capacity of soil (for clay and sand to be given separately) in shallow foundation with: (i) depth of foundati

Water tretement, define scale and sludge and mention the scale and sludge f...

define scale and sludge and mention the scale and sludge forming substance and explain the prevention methods

Determine the settlement of the foundation, The thiclcness of the normally...

The thiclcness of the normally consolidated soft clay layer is 6 m. The natural water content is 31 percent. The specific gravity of the soil being 2.68 with a liquid limit of 4

Main function of followers in driven h-piles, Question What is main fun...

Question What is main function of followers in driven H-piles ? Answer A follower is an extension between pile head and hammers which transfers blow to pile in which

Shear strength of concrete., why do we use effective depth ''d'' in calcula...

why do we use effective depth ''d'' in calculating the shear capacity of uncracked Concrete beam. If it is uncracked, why cant we use the full depth ''D''.

EIA, limitations of EIA

limitations of EIA

Write short note on stock verification, Q. Write short note on Stock Verifi...

Q. Write short note on Stock Verification? It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd