Question

What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation?


Answer

These methods aim at reducing placing temperature and falling thermal cracks induced during concreting of enormous pours. Because final concreting temperature has to be ambient temperature, reducing initial placing temperature will also lower peak hydration temperature. Therefore, temperature divergence between hydration peak and ambient temperature is reduced so and subsequently thermal effect to concrete structure can be abridged by controlling placing temperature.

 

 


Related Discussions:- Principle of adding cooling pipes

Classification of timber based on availability:, Classification Based on Av...

Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415

Define rotation - actions in pot bearings, Define Rotation - Actions in POT...

Define Rotation - Actions in POT Bearings? POT bearings are associated with large rotations which are accommodated by the deformation of elastomeric pad. Large cyclic rotations

Define the ultrasonic thickness measurement, Define the Ultrasonic Thicknes...

Define the Ultrasonic Thickness Measurement? Ultrasonic thickness meters measure the thickness of steel by passing an ultrasonic wave through the member. Thickness measurements

Steps to determine brake (bhp) and motor horsepower (mhp), Steps to determi...

Steps to determine the brake (bhp) and motor horsepower (mhp):  1) Determine water horsepower (whp). h A (Qgpm) (SG) / 3956 OR h A (Qcfs) (SG) / 8.814 2) Apply the pump

Design a 10 unit rapid sand filter system, Design a 10 unit rapid sand filt...

Design a 10 unit rapid sand filter system for a flow of 6.3 MGD with a filtration rate of 2 gpm/sq ft. and an L: W ratio of 1.3.   Design flow (Q) = 6.3 MGD = 6.3x106 gpd =

BUILDING CONSTRUCTION, GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH...

GIVE IN DETAIL THE TREATMENT OF TOP SURFACE OF EARTH FILLING..

Estimate prestress losses, Given: beam deminsions: flange width=22" FL...

Given: beam deminsions: flange width=22" FLANGE THICKNESS=7" WEB WIDTH=7" SECTION HEIGHT=40" f'c=5000psi f'ci=3500psi fpu=270ksi Ap=eighteen 1/2" diam strands superim

Highway economics, What is highway economics and what are its main contents...

What is highway economics and what are its main contents to study ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd