Question

What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation?


Answer

These methods aim at reducing placing temperature and falling thermal cracks induced during concreting of enormous pours. Because final concreting temperature has to be ambient temperature, reducing initial placing temperature will also lower peak hydration temperature. Therefore, temperature divergence between hydration peak and ambient temperature is reduced so and subsequently thermal effect to concrete structure can be abridged by controlling placing temperature.

 

 


Related Discussions:- Principle of adding cooling pipes

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

CUBE STRENGTH, IN CASE CUBE IS FAIL WHAT CAN IDO

IN CASE CUBE IS FAIL WHAT CAN IDO

Indian standard codes, Indian Standard Codes All of the major countrie...

Indian Standard Codes All of the major countries like India, UK, USA, and Australia have their own standards for material standards, design procedures, testing standards, and

Cleaning and greasing of rocker, Cleaning and greasing of Rocker & Roller b...

Cleaning and greasing of Rocker & Roller bearings of open web through girders : In case of standard open web through girders, no separate jacking arrangement is required as the en

Soil Mechanics, What relationship between Atterberg limits and cohesion

What relationship between Atterberg limits and cohesion

Determine about the statement - failure at cracking load, Determine about t...

Determine about the statement - Failure at Cracking Load This brittle mode of failure is likely to occur in those pre-stressed elements that are concentrically pre-stressed wit

Void ratio, why void ratio is greater for fine gained soil then course grai...

why void ratio is greater for fine gained soil then course grained soil.

Deflection of beams, 1) A propped cantilever beam ABC is 7m long.It has th...

1) A propped cantilever beam ABC is 7m long.It has the point C fixed and Point A on a roller support.It carries a 200Kn point load at a distance 3m from A.There is a moment of 80KN

Calculate the number of trucks for fleet working, A contractor was awarded ...

A contractor was awarded a Contract to excavate and haul 200,000-yds 3 of silty clay (USCS classification ML) with a bulking factor of 30%.  The contractor's fleet of dump trucks

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd