Inspection of girder bridge, Civil Engineering

Assignment Help:

Q. As an AEN in charge, what inspection will you under taken at the time of inspection of Girder Bridge 3 x 60 feet.

Please explain the important items to be observed while inspecting a multi span plat Girder Bridge of 18.3 m span.

Ans.

The Assistant Engineer shall inspect every bridge on the sub division including road and foot over bridges once a year after monsoon during the prescribed months and record results in ink in the Bridge inspection register.

Bridges the condition of which warrant special attention should be inspected more frequently.

In case of Girder Bridge 3 x 60 feet Bridge classified on major Bridge. For major bridges entries of bridge inspection should made under the following heads -

i. Foundation & flooring - Extent or scour and damage.

ii. Masonry - Condition and extent of defects.

iii. Protective works - Scour slips or settlement.

iv. Bed Blocks - Tendency to movement and cracking.

v. Bearing and expansion arrangements - Defects in seatings and expansion arrangements.

vi. Steel work - Structural condition of girders and Paint.

vii. Sleepers - Condition and renewals required.

viii. Track - Defects in line and level.

Under each head the first entry should state whether the previous year's notes have been attended.


Related Discussions:- Inspection of girder bridge

Explain critical factor in design of shock transmission unit, Explain Criti...

Explain Critical factor in Design of shock transmission unit? (a) STUs are unidirectional devices for load transmission. If out of plane forces will be acting on the STU, the a

Use of admixtures in concrete, Use of Admixtures in Concrete The use of...

Use of Admixtures in Concrete The use of chemical admixtures may be made in prestressed concrete construction. But the admixture should not contain chlorides in any form. This

Compatibility condition, Compatibility Condition: Total strain in ste...

Compatibility Condition: Total strain in steel = Total strain in copper i.e. 3 × 10 -4 + 1.965 × 10 -5 P s   = 4.5 × 10 -4 + 1.8421 × 10 -5 P c Recognising that P

Define fatigue load test of shock transmission unit, Define Fatigue load te...

Define Fatigue load test of shock transmission unit? This test was carried out for 100,000 cycles for maximum capacity of STU, assuming the worst case that the 'Lock Up Load' i

Variations of tendon stresses in pre tensioned concrete, Variations of tend...

Variations of tendon stresses in pre or post-tensioned concrete Variations of tendon stresses in pre or post-tensioned concrete members, along the length of tendons, may be of

Determine the nature of the soil, Determine the nature of the soil A gl...

Determine the nature of the soil A glass cylinder 5 cm internal diameter and with a screen at the bottom was used as a falling head permeameter. The thickness of the sample was

Zero energy building, This is our final year project can u suggest some tip...

This is our final year project can u suggest some tips to do well...

Human resource, Ask question #Minimum 100 words acceFor this discussion, lo...

Ask question #Minimum 100 words acceFor this discussion, look at a specific country of your choice. Develop two brief introductions, one for a U.S. peer, and one for a peer in anot

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd