Inspection of girder bridge, Civil Engineering

Assignment Help:

Q. As an AEN in charge, what inspection will you under taken at the time of inspection of Girder Bridge 3 x 60 feet.

Please explain the important items to be observed while inspecting a multi span plat Girder Bridge of 18.3 m span.

Ans.

The Assistant Engineer shall inspect every bridge on the sub division including road and foot over bridges once a year after monsoon during the prescribed months and record results in ink in the Bridge inspection register.

Bridges the condition of which warrant special attention should be inspected more frequently.

In case of Girder Bridge 3 x 60 feet Bridge classified on major Bridge. For major bridges entries of bridge inspection should made under the following heads -

i. Foundation & flooring - Extent or scour and damage.

ii. Masonry - Condition and extent of defects.

iii. Protective works - Scour slips or settlement.

iv. Bed Blocks - Tendency to movement and cracking.

v. Bearing and expansion arrangements - Defects in seatings and expansion arrangements.

vi. Steel work - Structural condition of girders and Paint.

vii. Sleepers - Condition and renewals required.

viii. Track - Defects in line and level.

Under each head the first entry should state whether the previous year's notes have been attended.


Related Discussions:- Inspection of girder bridge

Computation of settlement, Q. Computation of Settlement? The settlement...

Q. Computation of Settlement? The settlement  in any soil mass under an applied stress is given by s = s i + s c + s s where, S  =  total settlement, S i =  imm

State the problem and phases of site investigation, State the Problem and p...

State the Problem and phases of site investigation The site investigation is to be performed to obtain the solution for the following problems: i)  Foundation problems ii

Survey, How to find included angle during partical

How to find included angle during partical

Seismic loading principles, Seismic loading principles Ground motion ...

Seismic loading principles Ground motion Effects of ground motion are specified as one of the acceleration delineation spectrum or time history of acceleration variation m

Explain the corrosion by the action of bacteria, Explain the Corrosion by t...

Explain the Corrosion by the Action of Bacteria? Corrosion can also be accelerated by the action of bacteria.  In the absence of oxygen, sulphate-reducing bacteria can grow, an

Define limitations of underwater magnetic particle testing, Define Limitati...

Define Limitations of Underwater Magnetic Particle Testing? As with any non-destructive test method, UWMT has some limitations as under: i. Underwater magnetic particle tes

Drawing, how to draw an elipse

how to draw an elipse

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd