Q. As an AEN in charge, what inspection will you under taken at the time of inspection of Girder Bridge 3 x 60 feet.

Please explain the important items to be observed while inspecting a multi span plat Girder Bridge of 18.3 m span.

Ans.

The Assistant Engineer shall inspect every bridge on the sub division including road and foot over bridges once a year after monsoon during the prescribed months and record results in ink in the Bridge inspection register.

Bridges the condition of which warrant special attention should be inspected more frequently.

In case of Girder Bridge 3 x 60 feet Bridge classified on major Bridge. For major bridges entries of bridge inspection should made under the following heads -

i. Foundation & flooring - Extent or scour and damage.

ii. Masonry - Condition and extent of defects.

iii. Protective works - Scour slips or settlement.

iv. Bed Blocks - Tendency to movement and cracking.

v. Bearing and expansion arrangements - Defects in seatings and expansion arrangements.

vi. Steel work - Structural condition of girders and Paint.

vii. Sleepers - Condition and renewals required.

viii. Track - Defects in line and level.

Under each head the first entry should state whether the previous year's notes have been attended.


Related Discussions:- Inspection of girder bridge

Trigo, a pilot entering a bay on course

a pilot entering a bay on course

What is a footing foundation for a water tower, A footing foundation for a ...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

Building physics, Actually my course name is energy and sustainable buildin...

Actually my course name is energy and sustainable building design Do you know the building physics

Factors determining the stability of a single armour unit, Q. Factors deter...

Q. Factors determining the stability of a single armour unit There are mostly three major factors that govern the stability of an armour unit, viz gravity, intertangling and s

Tremie pipes are normally used with aid of hoppers, Question For underw...

Question For underwater concreting, tremie pipes are normally used with aid of hoppers. From time to time tubes are put in inside the hoppers and with reasons? Answer

Surveying, What is the shrinkage factor

What is the shrinkage factor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd