Soil particles for geotechnical design, Civil Engineering

Assignment Help:

Question

Will it worthwhile to take out tests on particle density of soil particles for geotechnical design?

Answer

Particle density of soils is definite by ratio of soil particle mass and soil element volume. Depending on soil category, range of variation of soil particle thickness varies not drastically as in by percent. So, it might not be useful to order laboratory tests and incur additional expenditure just to decide particles density by recognizing that variation of particles density is not significant.

 

 


Related Discussions:- Soil particles for geotechnical design

Calculate the uniformly distributed load, Given: pretensioned rectangula...

Given: pretensioned rectangular beam b=6" h=20" f'c=4000psi f'ci=3000psi fti=.165ksi fts=.38ksi fci=1.8ksi fcs=1.8ksi R=0.80 Required: (a)Pi and e to maximize Md+

Determine the coefficient of compressibility, A saturated clay layer 4 m th...

A saturated clay layer 4 m thick is located 6 m below GL. The void ratio of the clay is 1.0. When a raft foundation is located at 2 m below GL, the stresses at the top and bottom o

Assigning central pier and abutment as fixed piers, What are beneficial poi...

What are beneficial points of assigning central pier and abutment as fixed piers ?

Water piped scheme, how to use mood diagram to get f and other Re

how to use mood diagram to get f and other Re

Show the probable type of clay mineral, The liquid limit and plastic limit ...

The liquid limit and plastic limit of clay are 100% and 25%, respectively. From a hydrometer analysis it has been found that the clay soil having of 50% of particles smaller than 0

Edge piles take up more loads than central piles, Edge piles take up more l...

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Hydrographic data for design of bridge, Q.What Hydrographic data required f...

Q.What Hydrographic data required for Design of bridge? (i) Design discharge for bridge waterway and foundation with corresponding high flood levels. Frequency curve for annual

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd