Soil particles for geotechnical design, Civil Engineering

Assignment Help:

Question

Will it worthwhile to take out tests on particle density of soil particles for geotechnical design?

Answer

Particle density of soils is definite by ratio of soil particle mass and soil element volume. Depending on soil category, range of variation of soil particle thickness varies not drastically as in by percent. So, it might not be useful to order laboratory tests and incur additional expenditure just to decide particles density by recognizing that variation of particles density is not significant.

 

 


Related Discussions:- Soil particles for geotechnical design

Calculate distance between top and bottom chord of the truss, A W12x58 memb...

A W12x58 member, which comprises a vertical member in a truss span, is subjected to a factored axial compressive force of 163 kips.  The W12x58 section is oriented such that the st

#civil, what is whole circle barring

what is whole circle barring

Purpose of using capping layers in pavement construction, Q. Purpose of usi...

Q. Purpose of using capping layers in pavement construction? When California Bearing Ratio of subgrade is checked to be below a specific percentage (for example 5%), a capping

Joint filler in concrete expansion joints - a must, Joint filler in concret...

Joint filler in concrete expansion joints - a must?? Presence of joint filler is required to the proper functioning of concrete joints however some may doubt its value. For a c

Road and traffic engineering(signal timing design), what are the basic assu...

what are the basic assumption of traffic flow model and capacity model used in signal timing design ? discuss

Advantages of bonded post-tensioning systems, Advantages of bonded post-ten...

Advantages of bonded post-tensioning systems Some advantages of bonded post-tensioning systems over unbonded post-tensioning ones are the following : (a) Large reduction in

Surveying, dumpy level and its procedure

dumpy level and its procedure

Define bank volume to be stockpiled and used for backfill, An earthwork con...

An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building.  The existing grade elevation is 437.5-ft while the sub-base

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd