Question
Will it worthwhile to take out tests on particle density of soil particles for geotechnical design?
Answer
Particle density of soils is definite by ratio of soil particle mass and soil element volume. Depending on soil category, range of variation of soil particle thickness varies not drastically as in by percent. So, it might not be useful to order laboratory tests and incur additional expenditure just to decide particles density by recognizing that variation of particles density is not significant.
Question In designing of corbel beams in a pump station , why are shear links designed in top 2/3 of section? What is general advice on designing? Answer Corbel
Explain step by step procedure involved in the analysis and design of balanced cantilever bridge.
Q. What is Pratt truss? Pratt truss is characterized by having its diagonal members (except the end diagonals) slanted down towards the middle of bridge span. Under such struct
When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the
Q. Local vehicle parapet strong enough to contain vehicles? Majority of local parapets are 1.1m high in addition they are designed to resist impact from a 1.5ton car moving at
The head (energy) loss in the piping system between points 1 and 7 is the most nearly. Solution: 3 ft. The difference between point 1 and point 7 = 10 ƒt - 7 ƒt = 3 ƒt
Question During deep excavation , neighbouring ground water table is drawn down that might affect settlement of nearby buildings. What is remedial proposal to rectify situatio
Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i) By giving same sheet length and dam height, tensi
Design a 10 unit rapid sand filter system for a flow of 6.3 MGD with a filtration rate of 2 gpm/sq ft. and an L: W ratio of 1.3. Design flow (Q) = 6.3 MGD = 6.3x106 gpd =
Maintenance of Water Bound Macadam Roads:
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd