Define the Disintegration - underwater inspection of bridge?

Disintegration of concrete may be defined as the deterioration of concrete into small fragments or particles resulting from any cause. Disintegration may be differentiated from spalling by the mass of particle being removed from the main body of concrete. Disintegration is usually the loss of small particles and individual aggregate particles, while spalling is typically the loss of larger pieces of intact concrete.


Related Discussions:- Define the disintegration - underwater inspection of bridge

Shape factor, For a solid circular shaft transmitting torque, the shape fac...

For a solid circular shaft transmitting torque, the shape factor is

A concrete compression machine, Question In a concrete compression test , ...

Question In a concrete compression test , usually 150mmx150mmx150mm concrete cube examples are used for testing. Why isn't 100mmx100mmx100mm concrete cube samples used in test in

Reasons of ground heaving during pipe-jacking, Reasons of ground heaving du...

Reasons of ground heaving during pipe-jacking It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer mus

Doors and windows, important considerations in case doors and windows

important considerations in case doors and windows

Urban transport systems, Urban Transport Systems: Urban Transport P...

Urban Transport Systems: Urban Transport Problem Rapid urbanisation is taking place in India. The current urban population proportion of 28 per cent may reach 40 per

Settlement due to increasing load on surrounding soil, Q. Settlement due to...

Q. Settlement due to Increasing Load on Surrounding Soil? When any portion of the ground surface  has been loaded, it causes  the surface  of adjacent soil also to tilt and set

Ecology, subdivisions of ecology

subdivisions of ecology

Calculate the amount of concrete - construction management, An electrical c...

An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd