Is the fluid accelerating uphill

Assignment Help Civil Engineering
Reference no: EM13534552

A fluid with a specific weight of 100lb/ft^3 and a negligibleviscous effects flows in a pipe. The pipe is inclined at 30degrees. Point (1) is located above point (2) in the pipe. This means that the hypotenuse is 10ft long connecting point(2) to point (1). The Pressure at point (1) is 400 lb/ft^2and 900 lb/ft^2 at point (2). The velocities are equal. Is the fluid accelerating uphill, down hill, or not at all?

Reference no: EM13534552

Questions Cloud

Calculate the corrected distance : When measuring a distance AB, the first taping pin was placed 1.5ft to the right of line AB and the second pin was set 1.5 ft leftof line AB. The recorded distance was 236.89 ft. ( Assume 3 tapedsegements, the first two 100 ft each.) Calculate the co..
What is the length of the core in inches if the diameter is : If the porosity of a core sample is 26 percent, the pore volume is7.7 cc, what is the length of the core in inchesif the diameter is 1.5 inches?
What is the conversion rate for parts per million by volume : What is the conversion rate for parts per million by volume (ppmv)conversion. How is this converted into atm, Pa, and torr?
Calculate specific surface : Immediately after the bouncing golf ball leaves the floor itscomponent of velocity are Vx= 0.662 m/s and Vy= 3.66 m/s. determinethe horizontal distance from the point where the bal
Is the fluid accelerating uphill : A fluid with a specific weight of 100lb/ft^3 and a negligibleviscous effects flows in a pipe. The pipe is inclined at 30degrees. Point (1) is located above point (2) in the pipe.
Show that 1 millimeter of the 0.02 n h2so4 solution : A load of 14 tonnes is suspended at the end of a steel rope.If the load is subjected to a maximum acceleration/deceleration of2.5m/s2, when raised and lowered, calculate the diameter of therope needed to support the load. Assume the following:
Compute the pressure at a point in a building : A rectangular culvert 4 feet x 6 feet is running full and discharging 3,500 cfm. There is no friction loss. Find the velocity in fps. The culvert empties into a 10 ft wide culvert and the velocity reduces to 0.6 fps. How deep is the water level in th..
What is the meaning of most efficient crosssection : A rectangular channel has a bottomwidth = b and flow depth = y. Prove that for a given area, the mostefficient rectangular cross section is one with y = b/2.
What is the concentration in ppm at the downstream reach : Five million gallons per day (mgd) of a conservative substance,with concentration of 10 mg/L is released into a stream having anupstream flow of 10.0 mgd and a substance concentration of 3 mg/L.Assume complete mixing.

Reviews

Write a Review

Civil Engineering Questions & Answers

  At what distance will the concentration of metals be 5 ppm

Assume the stream is 3ft wide and 1ft deep (assume a rectangular cross section. If the flow throught the stream is 1000 gallons/day and the concentration at the beginning of the stream is 250 ppm

  Regular hexagonal pyramid

A regular hexagonal pyramid has an upper base edge of 16 ft. and a lower base edge of 28 ft. if the volume of the frustum is 18041 ft^3., find the lateral area of the frustum.

  Determine amplification factor and magnitude of steady state

determine the amplification factor and the magnitude of steady state response (for deflection at A), when a horizontal force of 20Sin(8t) (N) is applied at B. (L= 250 mm, distance from center of mass to C = 40mm)

  Find the friction head loss in 75 ft of pipe with velocity

Air at 70oF and atmospheric pressure flows with a velocity of 22 ft/s through a 3-in-diameter pipe (e = 0.00015 in). Find the friction head loss in 75 ft of pipe.

  What is the market value of the plants electricity annually

Biomass is increasingly used as a fuel to produce power and heat. A sugarcane-­? processing mill is powered by a biomass power plant with 140 MW of electricity and with 60 MW of heat in the form of steam for sugar extraction from the cane.

  Find the velocity at which shuttle hits the player bs racket

In Singles badminton game, shuttle is smashed by Player A from close to base line, which is 6 m from the net. Height of the net to be cleared by a smash is 1.55 m. The shuttle is hit by player A at a speed of 250 km/h.

  Determine thethickness of the water layer under the runners

A sled with two runners slides along a thin horizontal layer ofwater between the ice and the runners. The horizontal force thatthe water puts on the runners is equal to 1.2 lb when the sled'sspeed is 30 ft/s.

  Find the unknown quantity in each of the formulas and tables

find the unknown quantity in each of the following, using the standard series equivalence formulas and tables in the Appendix. Give preference to the approach yielding the fewest computational steps.

  Calculate primary consolidation settlement of the clay layer

A point load from a pier applies at ground surface which its magnitude is 1000KN. Calculate primary consolidation settlement of the clay layer at a distance of one meter from the point of application of the load.

  Determine the torque that develops in the rod in in-lb

The end of a 0.75-in-diameter rod is fixed to an immovable plate. The length of the rod is 18.0 in. A 50-lb weight is attached to a 16.0-in lever at the end of the Rod so that the weight is hanging perpendicular to the longitudinal axis of the rod..

  Design a column base plate

Design a column base plate for a W10 x 33 column supporting a service dead load of 20 kips and a service live load of 50 kips. The column is supported by a 12-inch x 12-inch concrete pier. Use A36 steel and f 'c = 3 ksi. Answer 12 x 12 x 5/8

  Define when would wells start interfering with each other

One of the wells pumps at a rate of 1240 m3/ day and the second well pumps at 850 m3/ day. If the aquifer has a transmissivity of 2000 m2/ day and a storage coefficient of 4 x 10^-4, when would the wells start interfering with each other

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd