Determine the centerline and control limits

Assignment Help Project Management
Reference no: EM13537600

Question 2: A given model of large radar dish represents the area of opportunity in which nonconformities may occur. Results of quality check for 25 radar assemblies are as follows:

Radar Assembly Number

Number of Nonconformities

1

25

2

60

3

28

4

65

5

91

6

56

7

40

8

54

9

90

10

44

11

62

12

81

13

70

14

75

15

24

16

50

17

70

18

56

19

21

20

88

21

34

22

82

23

53

24

102

25

64

a- Determine the centerline (show your calculations)

b- Determine the control limits (show your calculations)

c- Use MINITAB to develop the appropriate control chart

d- Are there any indications of lack of control?

e- What to do next?

Reference no: EM13537600

Questions Cloud

Equation relating energy levels of the harmonic oscillator : A lithium atom, mass 1.17 x 10-26 kg, is vibrating with simple harmonic motion in a crystal lattice, where the force constant is 71.0 N/m. Write the equation relating the energy levels of the harmonic oscillator to the quantities given.
When does the out-of-control behavior occur : What is the appropriate control chart that can be used by the quality engineer and determine the control limits (show your calculations)
Construct the appropriate control chart : What is the appropriate control chart that can be used by the quality engineer in this case, determine the control limits and construct the appropriate control chart for the data above using MINITAB.
Explain solution is cloudy after precipitation and heating : If the solution is cloudy after precipitation and heating, what does this indicate. Can the solution be filtered at this point
Determine the centerline and control limits : Determine the centerline, determine the control limits, Use MINITAB to develop the appropriate control chart and are there any indications of lack of control
Evaluate the agno3 needed to precipitate : If a 400 mg sample is assumed to be pure NaCl, calculate the millimeters of 0.1M AgNo3 needed to precipitate it completely
Explain the movable plunger on a syringe : Because of the movable plunger on a syringe, the gas inside the syringe can be held at a constant pressure of 1.00 atm while allowing the volume of the gas to increase or decrease.
Estimate how much time does the lift take : Your sofa won't fit through the door of your new sixth-floor apartment, so you use a 1.08kW motor to lift the 84.4kg sofa 15.6m from the street. How much time does the lift take
Find the centerline and find the control limits : Find the centerline and find the control limits, Use MINITAB to develop the appropriate control chart and Are there any special causes of variation?

Reviews

Write a Review

Project Management Questions & Answers

  Business question managerial decision makingassume that you

business question managerial decision makingassume that you are part of a mediation team that has been brought in to

  Gov and npo scenario - capital project consideration

Gov and NPO scenario - Capital Project Consideration - Except the discount would be borne by the capital projects fund.

  Managerial decision making

How could the fixed pie concept come into play in this situation and Managerial Decision Making

  Criticism of traditional measures of performance

Criticism of traditional measures of performance

  Question related to project variances-earned value analysis

Explain what are the spending and schedule variances for the project? What are the SPI and CPI?

  Project metricsproject metrics are fundamental to project

project metricsproject metrics are fundamental to project risk management. identify two metrics that are important for

  Create a risk identification checklist

Create a risk identification checklist, and  Update risk management documents.  Procedure

  Our current equipment is fully deprieciated and can produce

Your current equipment is fully deprieciated and can produce 2,000 units per year with a margin of $4.00 per unit.Should you perchase the new equipment? Under what conditions?

  Evaluating a new project by current rental income

When evaluating a new project, the firm should consider all of the following factors except: Current rental income of a building owned by the firm if it is not used for this project.

  Organisation is bidding for a construction project

Organisation is bidding for a construction project

  Scope time and cost constraints of projecthow are the

scope time and cost constraints of projecthow are the triple constraints related and how are they affected by change?

  Delegate responsibility for tasks to others

Do you have to delegate responsibility for tasks to others? What are some of the difficulties you face while trying to delegate responsibility?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd