Write short note on stock verification, Civil Engineering

Assignment Help:

Q. Write short note on Stock Verification?

It is desirable that there should be a frequent reconciliation of the balances as shown in the numerical ledgers kept by the subordinates with the actual quantities hand. The Executive engineer should there fore arrange that approximately one sixth of the stock under each subordinate is verified by actual count each month so that the whole district or divisional stock is verified at least once every six months. The verification is in addition to the stock verification made by Accounts stock verifiers. All discrepancies should be enquired into. discrepancies if small i.e. not amounting in value to more than Rs 100 may after the executive Engineer has satisfied him self by investigation that no irregularity has occurred be adjusted to final heads under his orders. If the amount involved exceeds this amount the matter should be reported to the higher authorities for orders.


Related Discussions:- Write short note on stock verification

Determine the analysis of presress, Analysis of presress  In pre-stress...

Analysis of presress  In pre-stressed structural elements, stretched tendons are placed inside concrete. The tensile stresses of the tendons are transferred to concrete in the

Sucker deck principle for changeable depth bridge decks, Question What is t...

Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greate

Compass survey, define compass survey and mention its objectives

define compass survey and mention its objectives

Key meaning of excellence of bentonite slurry, Question What is key me...

Question What is key meaning of excellence of bentonite slurry in construction of diaphragm walls? Answer Quality of slurry plays a significant role in quality of di

Define the finish to finish activity, A finish-to-finish activity is best d...

A finish-to-finish activity is best described as: The "from" activity must finish before the "to" activity can finish The "from" activity must finish before the "to" acti

Centroid, how tofind centroid of cercular arc

how tofind centroid of cercular arc

Describe principles of river protection works, Q. Describe Principles of ri...

Q. Describe Principles of river protection works? Determination of design discharge for a bridge is sometimes required to be based on flood marks left during unprecedented abno

Jacking face for pipe-jacking, Ground settlement occurs ahead or behind the...

Ground settlement occurs ahead or behind the jacking face for pipe-jacking? It's reported by Lake (1992) that settlements are expected at ground surface at a distance of 1-2 ti

Stress corrosion of pre-stressing steel, Stress corrosion of pre-stressing ...

Stress corrosion of pre-stressing steel Stress corrosion is crystalline cracking of metals under tensile stresses in the presence of corrosive agents. Conditions for stress cor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd