Q. Describe Principles of river protection works?

Determination of design discharge for a bridge is sometimes required to be based on flood marks left during unprecedented abnormal floods. A flow formula is then used to estimate discharge corresponding to flood marks. The river section is often composite comprising flow section with one or more deep channels and an overbank area carrying spill flow. Allowance for such variation is required to be made in application of the flow formula, suitable procedure for which needs to be known.

Excessive constriction of waterway by approach banks results in rise of water level which is termed afflux. Apart from construction of waterway, afflux is also caused due to pier obstruction. The extent of afflux is an important consideration in fixing bridge waterway.


Related Discussions:- Describe principles of river protection works

Soil in road construction, Soil in Road Construction: Road Embankme...

Soil in Road Construction: Road Embankment and Sub-grade Soil is mainly used as the material for constructing a road embankment. The road embankment supports the road

Lintel, Classification of lintels

Classification of lintels

Compute the thermal stresses in steel, Compute the thermal stresses in stee...

Compute the thermal stresses in steel: Consider the compound bar shown in below figure consisting of a steel bolt of diameter 18 mm, surrounded through a copper tube of outer

Normal approximation to compute the probability, Normal approximation to co...

Normal approximation to compute the probability: A lot contains 100 articles of which 10 are defective. The lot is rejected if a random sample of 10 articles drawn from the lo

Distomat, applications of distomat in briefly

applications of distomat in briefly

Retaining wall, I retained the soil in my yard by brick with 3 levels to a...

I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o

What to do to improve the reliability of the test results, Explain clearly ...

Explain clearly with a neat sketch how you will verify the coefficient of permeability of a clay sample in the laboratory and derive the expression used to compute the permeability

Define the phreatic line and phreatic zone, Define the Phreatic Line and Ph...

Define the Phreatic Line and Phreatic Zone Phreatic Line: In an unconfined aquifer, it represents the water table.   Phreatic Zone: In an unconfined aquifer, it is located b

Civil engineering drawing, Explain step by step procedure involved in the a...

Explain step by step procedure involved in the analysis and design of balanced cantilever bridge.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd