Velocity distribution and flow formulae, Civil Engineering

Assignment Help:

Q. Velocity distribution and flow formulae?

Variation in velocity along a vertical in channel cross section is known to follow logarithmic distribution, maximum velocity being at the top and minimum at the bottom. Mean velocity is obtained at 0.632 depth from top. Average of velocities measured at 0.2 and 0.8 depths from top also gives the mean velocity. The velocity distribution along a vertical depends on depth and relative roughness of bed material. If bottom roughness is increased, the bottom velocity is decreased and top velocity correspondingly increased.


Related Discussions:- Velocity distribution and flow formulae

Measure the stress increment, A raft of size 4 m × 4 m carries a uniform lo...

A raft of size 4 m × 4 m carries a uniform load of 200 kN/m 2 . Using the point load approximation with four equivalent point loads, measure the stress increment at a point in the

.., Ask questiPermanent Way:on #Minimum 100 words accepted#

Ask questiPermanent Way:on #Minimum 100 words accepted#

Determine the coordinate for point r, For the project work points (x,y) sho...

For the project work points (x,y) shown in the figure the bearing of point R is due West. The coordinate for point R is most nearly:    Solution: Determine the length o

Determine concentration of total solids and volatile solids, The following ...

The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant.  The tests were performed using the standard methods. Dete

Deflections of bars, how do one uses the Macauleys model to find deflection...

how do one uses the Macauleys model to find deflections of bars

Explain the departure of a line - transportation, Explain the Departure of ...

Explain the Departure of a line - Transportation Departure of a line is the distance that the line extends in an east or west direction. A line that runs towards east has a pos

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd