Drainage of embankment slopes, Civil Engineering

Assignment Help:

Drainage of Embankment Slopes:

Slopes of high embankments get eroded by rain water. Deep rain cuts are formed, which endanger the pavement. In such cases, it is customary to provide flumed drains, by which the water is collected at regular intervals, and led to lined flumes along the slopes. Figure gives the arrangement.

1789_Drainage of Embankment Slopes.png

Figure : Curb, Gutter and Flume Arrangement for Drainage of High Embankments


Related Discussions:- Drainage of embankment slopes

Evaluate dimensions of apron according to spring and gale, Q. Evaluate dime...

Q. Evaluate dimensions of apron according to Spring and Gales? Dimensions of apron according to Spring and Gales. Gales and Sethi favoured uniform thickness of laid apron while

Continuous prestressed concrete beam design , Assignment:-Continuous Prestr...

Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced

Define vertical curves - transportation, Define Vertical Curves  - Transpor...

Define Vertical Curves  - Transportation 1) Vertical curves are used to change the grade of a highway. 2) Most vertical curves take the shape of an equal-tangent parabola.

Why do we need to control air pollution, Why do we need to control air poll...

Why do we need to control air pollution? a. It causes harmful effects on human health,  Materials and property,  Plants and Animals, Visibility, Global climate and others b.

Concrete mixers, what do you mean by buttering mixers

what do you mean by buttering mixers

Use Structural Analysis in Engineering, As per Australian Standard AS 1170,...

As per Australian Standard AS 1170, what are the different types of loads that can be encountered by structures which need to be taken into account for their design?

Convert the azimuth reading of 273.34 to a land bearing, Convert the azimut...

Convert the azimuth reading of 273.34º to a land bearing:  Solution: Convert 273.34º to degrees minutes and seconds = 273º 20' 24" Next, convert the angle to orient to IV

Verify the net allowable bearing pressure, A 1.8 m square column is founded...

A 1.8 m square column is founded at a depth of 1.8 m in sand, for which the accurate N-value is 24. The water table is at a detph of 2.7 m. Verify the net allowable bearing pres

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd