What is atterberg limits tests, Civil Engineering

Assignment Help:

What is Atterberg Limits tests?

The Atterberg Limits tests are designed to determine the plasticity of finer grained soils. These tests are performed on the fraction less than 0.425 mm (passing the No. 40 Sieve). 

  • The liquid limit (LL) is the moisture content at which the soil sample passes from the plastic state to the liquid state.
  • The plastic limit (PL) is the moisture content at which the soil sample passes from the semisolid to the plastic state.
  • The plasticity index (PI) is the difference in moisture content from the threshold of the plastic to liquid state to the threshold of the semisolid to plastic state.

Related Discussions:- What is atterberg limits tests

Contractor to continue concreting works, Question If on-site slump test fai...

Question If on-site slump test fails, is it necessary that engineers allow a contractor to continue concreting works ? Answer This is an extremely traditional question raised by

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

What do you mean by manhole loss, Q. What do you mean by Manhole loss? ...

Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str

Cleanliness of surface - limitations of ultrasonic system, Define Cleanline...

Define Cleanliness of Surface - Limitations of Ultrasonic System? Sound energy transmission is greatly affected by marine growth on the surface of the concrete element. Ultraso

Culverts, Can anyone help me in finding the formula for submerged and unsub...

Can anyone help me in finding the formula for submerged and unsubmerged flow in culverts?

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Aashto method, Question 1: A stationary 40 kN single axle load (applied on...

Question 1: A stationary 40 kN single axle load (applied on a circular contact area of radius = 152 mm = 6") is applied to each of the flexible pavement structures indicated below

Surveying, if bearing of AB is 190& that of CB is 260,the included angle AB...

if bearing of AB is 190& that of CB is 260,the included angle ABC is how?

What is the long term effects - concrete, What is the Long Term Effects - C...

What is the Long Term Effects - Concrete Long term effects of  loads on structures consider all the effects including creep and shrinkage.

What do by diaphragm wall, Q. What do by Diaphragm wall? For the constr...

Q. What do by Diaphragm wall? For the construction of diaphragm walls adjacent to buildings, former experience showed that excess slurry head above groundwater level had to be

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd