Write short notes on aqua privy latrine, Civil Engineering

Assignment Help:

Q. Write short notes on Aqua Privy Latrine?

There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided. The excreta together with flush water falls into the septic tank where it under goes anaerobic decomposition. The effluent flows to filters and then to soak pits. These tanks are designed for a capacity of 70 Liter / head / day and for a population even up to several thousands. A raw of water closets may be constructed over single septic tank. A grit chamber is necessarily provided at the inlet end of the septic tank which detains hard solid masses of faces which would other wise pass undigested at the other end . the grit chamber is made by erecting a wall at 1/6th the length of tank from in let side. This wall has an opening at the bottom so that excreta pieces are held on the surface in grit chamber till they are decomposed and digested while the main flow passes down through the opening at the bottom.


Related Discussions:- Write short notes on aqua privy latrine

Proctor test for GSB material, what is the procedure for gsb proctor test f...

what is the procedure for gsb proctor test for matrial sampling for lab density

Sewer, what are the procedure of surveying for sewer projects/

what are the procedure of surveying for sewer projects/

Loss of prestress due to creep of concrete, Loss of prestress due to creep ...

Loss of prestress due to creep of concrete Creep of concrete means time dependent deformation of concrete. Its effect depends upon the interval of  time for which the member is

Deformation equation for settlement, Q. Deformation Equation for settlement...

Q. Deformation Equation for settlement? When a load is applied on an elastic body, it results in strain. The summation of strain over a length is deformation or settlement. In

Bitumen tests, discussion of each bitumen test, its significance and import...

discussion of each bitumen test, its significance and importance in understanding and working with bitumen

Plumbing technology, This assessment will test Learning Outcomes 3 and 4 as...

This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect

Underwater inspection procedures - inspection of bridge, Explain the Underw...

Explain the Underwater inspection procedures - inspection of bridge? Under-water bridge inspection, especially the initial inspection, requires careful planning to ensure that

Cross section diagram of urban road, cross section diagram of urban roan in...

cross section diagram of urban roan in embankment,in cut,in eight lane,in conjusted area,divided hihgway

What do you understand by pressure line, What do you understand by Pressure...

What do you understand by Pressure line If we determine the locations of resultant force at various sections of a pre-stressed beam, as in Example, we can draw a curve showing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd