Write short notes on aqua privy latrine, Civil Engineering

Assignment Help:

Q. Write short notes on Aqua Privy Latrine?

There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided. The excreta together with flush water falls into the septic tank where it under goes anaerobic decomposition. The effluent flows to filters and then to soak pits. These tanks are designed for a capacity of 70 Liter / head / day and for a population even up to several thousands. A raw of water closets may be constructed over single septic tank. A grit chamber is necessarily provided at the inlet end of the septic tank which detains hard solid masses of faces which would other wise pass undigested at the other end . the grit chamber is made by erecting a wall at 1/6th the length of tank from in let side. This wall has an opening at the bottom so that excreta pieces are held on the surface in grit chamber till they are decomposed and digested while the main flow passes down through the opening at the bottom.


Related Discussions:- Write short notes on aqua privy latrine

Survey, 3-d figure of line ranger

3-d figure of line ranger

Soil testing, what is black cotton soil in dry condition

what is black cotton soil in dry condition

Block contouring, how to calculate contour surveyed area

how to calculate contour surveyed area

Explain the term - characteristic strength, Explain the term - Characterist...

Explain the term - Characteristic Strength The strength of  a material below which not more than 5 percent results are expected to fall is considered as the characteristic stre

Illustrate the concept of load balancing, Concept of load balancing In ...

Concept of load balancing In above cases of concentric and eccentric pre-stressing, straight tendon profiles (or tendon shapes) along the beam span have been considered. If a t

Physics, interplanar spacing

interplanar spacing

Show the excessive movement joints in bridges, Q. Show the Excessive moveme...

Q. Show the Excessive movement joints in bridges? Movement joints are generally added to bridge structures to accommodate movements because of dimensional changes arising from

Softening point test, Softening Point Test: The temperature at which ...

Softening Point Test: The temperature at which bitumen softens is determined by the "Ring and Ball" test (Figure). (a) Diagram of Apparatus at Beginning of Test  (b

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd