Write short notes on aqua privy latrine, Civil Engineering

Assignment Help:

Q. Write short notes on Aqua Privy Latrine?

There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided. The excreta together with flush water falls into the septic tank where it under goes anaerobic decomposition. The effluent flows to filters and then to soak pits. These tanks are designed for a capacity of 70 Liter / head / day and for a population even up to several thousands. A raw of water closets may be constructed over single septic tank. A grit chamber is necessarily provided at the inlet end of the septic tank which detains hard solid masses of faces which would other wise pass undigested at the other end . the grit chamber is made by erecting a wall at 1/6th the length of tank from in let side. This wall has an opening at the bottom so that excreta pieces are held on the surface in grit chamber till they are decomposed and digested while the main flow passes down through the opening at the bottom.


Related Discussions:- Write short notes on aqua privy latrine

Functioning of a septic tank in a sewerage disposal system, Q. Write short ...

Q. Write short notes on the following : a) Points to be kept in mind while collecting water samples for testing from tap, stream & T/well separately. b) Where and why foot

Compression vs tension, Behaviour of struts in compression compared with th...

Behaviour of struts in compression compared with the behaviour of struts in tension? Also do you know a credible source that I can reference?

Cost-volume-profit and break even analysis, Cost-Volume-Profit and Break Ev...

Cost-Volume-Profit and Break Even Analysis: Cost-volume-profit analysis helps us to learn the behaviour of cost and profit in response to varying level of business activity. I

Explain the maximum spacing of piles, Q. Explain the Maximum spacing of pil...

Q. Explain the Maximum spacing of piles? One of the factors which affect the distribution of loads from the structures to each pile is assumption of flexibility of the pile ca

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Dynamics202, Determine the minimum speed of the stunt rider, so that when h...

Determine the minimum speed of the stunt rider, so that when he leaves the ramp at A he passes through the center of the hoop at B. [5 Points] 2. How far h should the landing ramp

Distomat, short note about characteristics of distomat

short note about characteristics of distomat

Air infiltration, Using Matlab/ Simulink software, verify the heating requi...

Using Matlab/ Simulink software, verify the heating requirement (kW) for the building because of  air infiltration and natural ventilation. Note that this needs you to estimate air

Advantages of unbonded post-tensioning systems, Advantages of unbonded post...

Advantages of unbonded post-tensioning systems Similarly, some advantages of unbonded post-tensioning systems over bonded post-tensioning ones may be written as under :  (a)

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd