Write short notes on aqua privy latrine, Civil Engineering

Assignment Help:

Q. Write short notes on Aqua Privy Latrine?

There are a sort of latrines also called septic tank latrines. These are constructed over septic tanks & flushing is also provided. The excreta together with flush water falls into the septic tank where it under goes anaerobic decomposition. The effluent flows to filters and then to soak pits. These tanks are designed for a capacity of 70 Liter / head / day and for a population even up to several thousands. A raw of water closets may be constructed over single septic tank. A grit chamber is necessarily provided at the inlet end of the septic tank which detains hard solid masses of faces which would other wise pass undigested at the other end . the grit chamber is made by erecting a wall at 1/6th the length of tank from in let side. This wall has an opening at the bottom so that excreta pieces are held on the surface in grit chamber till they are decomposed and digested while the main flow passes down through the opening at the bottom.


Related Discussions:- Write short notes on aqua privy latrine

CUBE STRENGTH, IN CASE CUBE IS FAIL WHAT CAN IDO

IN CASE CUBE IS FAIL WHAT CAN IDO

What is stress corrosion, What is Stress Corrosion Stress corrosion ta...

What is Stress Corrosion Stress corrosion takes place in prestressed concrete tendons due to the combined actions of corrosion and static tensile stresses. This type of attack

Bearings, what is the difference between whole circle bearing and reduced b...

what is the difference between whole circle bearing and reduced bearing?

Explain interim inspection - underwater inspection of bridge, Explain the I...

Explain the Interim inspection - underwater inspection of bridge An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is us

Define equipments required for conducting uwmt, Define Equipments required ...

Define Equipments required for conducting UWMT? Equipments required for conducting UWMT are: Inspection Equipment: a) Electronic yoke with power cable b) Ground fault interr

Bond breaker for joint sealant, Joint sealant must be designed and construc...

Joint sealant must be designed and constructed to allow free extension and compression during the opening and closure of joints. In case joint sealants are attached to joint filler

Moisture content, What is moisture content for road work

What is moisture content for road work

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd