If in case mud waves occur during reclamation, what are probable solutions to rectify the situation?
Answer
(i) Option 1 - Complete Removal of All Disturbed Mud To take away all disturbed mud once mud waves occur is fastest means to treat problem. Later than that, filling material is used for replacing disturbed mud. Though, this alternative is a rather costly option because it involves dredging of all disturbed mud and replacement of large quantity of fill.
(ii) Option 2 - Accelerated consolidation of Disturbed Mud This alternative involves placement of surcharging loads on top of mud waves, mutually with installation of band drains to accelerate consolidation of disturbed mud. This scheme suffers from drawback that enough long time is required for consolidation process of mud.
(iii) Option 3 - Partial Removal of Disturbed Mud This alternative is a combination of first two options in which top weak layer of mud is removed even as lower mud is treated with surcharging with band drain installation.
HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC
Q. Utilisation of Buoyancy Effect? Submerged part of the substructure will be subjected to buoyancy effect. The uplift pressure from the ground water can be utilised by constru
Culverts, Causeway and Bridges: Roads have to cross several natural streams like - rivers and canals. They also have to cross railway lines and cross-roads. The structures nee
How to calculate the whole circle bearing from the included angles?
which truss is suitable for 19*22m span on which mangalore tiles can be placed or shud steel truss be preferred for such span and which 1 is more profitable in rural desiggn...
What are the conditions essential for Darcy's law to be applicable for flow of water by soil ? Why is the permeability of a clay soil with flocculated structure greater than tha
Estimate the Activity Durations The total labor cost for emergency bridge rehabilitation on an interstate highway is $5,716,440. The average crew-hour cost is $15,879 for this
What areb the philosophical elements of strategic planning?
the behaviour of structural materials
Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction. The field moisture test finds that fi
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd