What is objective method of assessment, Civil Engineering

Assignment Help:

Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

State an expression for zero air-void line, State an expression for 'zero a...

State an expression for 'zero air-void line' and illustrate the line for a specific gravity of 2.65. What are the various factors that affect the compaction of soil in the field

Curved surface profiles, Question Why is concrete profile barriers plan...

Question Why is concrete profile barriers planned with curved surface profiles ? Answer Safety fencings are designed to include vehicles in carriageway in that they a

Surveying, what is the trignomerty leveling

what is the trignomerty leveling

Gas welding be erected in upright position, Question Explain some reaso...

Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel

Explain working of ultrasonic system for concrete elements, Explain the wor...

Explain the working of Ultrasonic System for Concrete Elements? Ultrasonic methods can be used underwater for overall assessment of the strength of concrete based on sound velo

Earth fill dams, Ask question #Minimum 100E. The regulations and specificat...

Ask question #Minimum 100E. The regulations and specifications that followed for compaction works for earth dam in Oman words accepted#

What is uniformly distributed surcharge, A retaining wall with a smooth ve...

A retaining wall with a smooth vertical back, 4.5 m high, retains a dry cohesionless backfill level with the top of the wall. γ = 18.6 kN/m 3 and φ = 30°. The backfill carries a u

Reinforcement of concrete in contact with internal vibrators, Reinforcement...

Reinforcement of concrete in contact with internal vibrators  At the time of concreting, if internal vibrators are placed accidentally in contact with some of the reinforcemen

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd