What is objective method of assessment, Civil Engineering

Assignment Help:

Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

What is the meaning of term - slip in anchorage, What is the meaning of ter...

What is the meaning of term -Slip in Anchorage In the case of post-tensioned concrete, when the tendons are anchored at the ends of concrete members, a slip of  tendons takes

Testing of aggregates, Testing of Aggregates: For use in pavement, ro...

Testing of Aggregates: For use in pavement, road aggregates have to be strong, durable and of good shape. A well-graded aggregates adds to the stability of the layer. The fol

Flash point test, Flash Point Test: The flash point is the temperatur...

Flash Point Test: The flash point is the temperature at which the bitumen gives off vapours which ignite in the presence of a flame. The flash point temperature gives the cri

Highway, what is the difference between bitumin and asphalt

what is the difference between bitumin and asphalt

Geotechnical, send any civil engineering related questions . i will write t...

send any civil engineering related questions . i will write the answers , please tell us the process .

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

Mensuration, My team has to construct a swimming pool at the back of the ho...

My team has to construct a swimming pool at the back of the house. It’s interior dimensions are 10M x 3M and 1M at the shallow end and 2.5M at the deep end. The walls and the bas

Estimate the jam density in one lane of trucks, At a large port facility ne...

At a large port facility near New York City tractor-trailer trucks are lined-up in long queues as their drivers wait to have their containers inspected and documents processed.  As

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd