What is objective method of assessment, Civil Engineering

Assignment Help:

Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

Device of cavitations in pipes and drains, Question What is device of cavit...

Question What is device of cavitations in pipes and drains ? Answer Cavitations refer to arrangement of air foam in fluid in low-pressure condition that is lower than satura

Air traffic control, Air Traffic Control: Importance of Air Traffic...

Air Traffic Control: Importance of Air Traffic Control Air Traffic Control is a system by which routes for flying aircraft are defined, flight rules are framed, and f

Determine the in-situ dry unit weight, Q. The following observations were r...

Q. The following observations were recorded in a Field density determination by sand-replacement method: Volume of Calibrating can = 1000 cm3 Weight of empty can = 10 N We

Determine the preliminary settlement analysis, Preliminary settlement analy...

Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an  ultimate  settlement  of  250 mm.  The average pressure increment in the clay stra

Foundation depth and arrangement, Foundation Depth and Arrangement: Th...

Foundation Depth and Arrangement: There are two types of foundations, viz, (a) Shallow foundations, also known as open foundations, and (b) Deep foundations. Slab cul

Hazard, • A potential source of harm - Mechanical hazard - Electrical...

• A potential source of harm - Mechanical hazard - Electrical hazard - Cutting hazard - Toxic hazard - Fire hazard - Explosion hazard

Concrete technology, what is the actual quantity of water to be mixed in va...

what is the actual quantity of water to be mixed in various grade of concrete and also the size of gravel to be mixed with in RCC work. Also I want to know the difference between a

Calculate the volume of 896, Solve the following problems related to Wastew...

Solve the following problems related to Wastewater flow and densities (a) The volume of 896, 000 lb of wastewater is? (b)  The weight of 13,000 ft3 of wastewater is? (c) A

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd