What is objective method of assessment, Civil Engineering

Assignment Help:

Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

Draw the variation in total stress, Draw the variation in total stress, eff...

Draw the variation in total stress, effective stress, and pour water pres- sure up to a depth of 6 m below ground level, given the following data. The water table is 2 m below grou

#survey, Ask question #chaining and rangingMinimum 100 words accepted#

Ask question #chaining and rangingMinimum 100 words accepted#

Surveying, what are the basic two division of surveying

what are the basic two division of surveying

Classification of bricks based on their quality, Classification of Bricks B...

Classification of Bricks Based on their Quality The bricks used in construction are classified as following: First class bricks Second class bricks Third class bric

Explain statically indeterminate structures, Explain Statically Indetermina...

Explain Statically Indeterminate Structures  Fall into two categories:   1.  Beam problems with additional supports/restraints 2.  Axial bar members subjected

Functions of a column in a building, What are the functions of a column in ...

What are the functions of a column in a building? Ans) A column is used to handle the weight of the roof and/or the upper floors. Now days, many columns are used for decorative

Define creep settlements, Creep occurs (secondary compression) after consol...

Creep occurs (secondary compression) after consolidation settlements. We defined consolidation settlement, as that compression during which excess pore pressure exists in the strat

Guiding considerations in planning, Guiding Considerations in Planning: ...

Guiding Considerations in Planning: The following factors have a bearing on planning water transport facilities : (a)        Availability adequate land to accommodate the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd