Q. What is objective method of assessment?
Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording
i. Hallade Track Recorder.
ii. Amsler Track Recording Car.
iii. Oscillograph Car.
iv. Portable Accelerometer.
v. Track Recording cum Research Car.
vi. Track Recording Trolley.
State about the pre-tensioned concrete In pre-tensioned concrete, the tendon stresses are transferred to concrete by virtue of bond of concrete to the surface of steel tend
Explain the term - Uniaxial - Biaxial -Triaxial Prestressing These terms refer to cases when the concrete is prestressed in only one direction, in two mutually perpendicular di
applications of distomat in briefly
Q. Application of bitumen to driven piles? In a certain area of H-piles subjected to ground water table fluctuation, painting is occasionally applied on the surface of H-piles
Ground settlement occurs when pipe-jacking machine enters mixed ground with soils and boulders? The rate of cutting through soils is faster than cutting through boulders for pi
i need simple ans for this question tell me precaution of dampness
Explain the Driver Expectancy A fundamental component of driver information processing and perception. Drivers operate with a set of expectancies, e.g.: 1) Freeway exits wil
What is WBM road. How it is constructed?
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was
State the Loss of prestress Loss of prestress due to elastic shortening definitely occurs in pre-tensioned concrete members. But in post-tensioned members it does not occur if
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd