Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

Arches, construction of arches

construction of arches

Shear slump and collapse slump in slump tests, Question What is sign of sh...

Question What is sign of shear slump and collapse slump in slump tests? Answer There are three varieties of slump that might occur in slumps test, specifically, slump, shear

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Steel overlap in columns, where we can overlap steel in columns if we use ...

where we can overlap steel in columns if we use 50 or 60 bar diameter as overlap length.

Determine the plastic limit of the soil, The liquid limit of a clay soil is...

The liquid limit of a clay soil is 56% and its plasticity index is 15%.  (a) Name the state of consistency is this material at a water content of 45% ? (b) Determine the plas

What is the design mix concrete, What is the Design Mix concrete Determ...

What is the Design Mix concrete Determination of  the proportions of  cement, aggregates and water to  achieve the required strengths in concrete is made by designing  the  con

Solid mensuration, a street light is 15 ft directly above the curb. a 6 ft ...

a street light is 15 ft directly above the curb. a 6 ft man starts 10 ft down the street from the light and walks directly across the street which is 10 ft wide. when he reaches th

Strenght of meterials 2, Difference between direct and bending stress diagr...

Difference between direct and bending stress diagrams

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd