Q. What is objective method of assessment?

Track recording consists of objective method of assessment of the quality of track with the help of sophisticated equipments. A continuous record of various track parameters is made with the help of the track recording devices from which an assessment can be made about the running quality of track. Using any of the following equipments- normally does track recording

i. Hallade Track Recorder.

ii. Amsler Track Recording Car.

iii. Oscillograph Car.

iv. Portable Accelerometer.

v. Track Recording cum Research Car.

vi. Track Recording Trolley.


Related Discussions:- What is objective method of assessment

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Building, What quantity of cement will be needed to lay 2000 blocks of 9 in...

What quantity of cement will be needed to lay 2000 blocks of 9 inches using a mortar ratio of 1:6 with a thickness of 25mm in-between blocks.

Acidity and alkalinity - chemical characteristics of water, Acidity and Alk...

Acidity and Alkalinity - Chemical Characteristics of Water Acidity: Capacity to neutralize bases and is a measure of acids in water. Acidity is measured by titrating the s

Major bridge and important bridge, Major bridge - Major bridge is one of wh...

Major bridge - Major bridge is one of which has a total linear waterway of 18 m or more for multiple span and total linear water way of 12 m or more for single span. Important b

Scales and sludges, Discussscales and sludges. Writea note on internal trea...

Discussscales and sludges. Writea note on internal treatment of water

Types of cross-drainge structures, Types of Cross-drainage Structures: ...

Types of Cross-drainage Structures: The following are the types of cross-drainage structures : (a) Culverts, having waterway upto 6 m. (b) Minor Bridges, having waterwa

Design a water supply scheme for new railway colony, Q. Design a water supp...

Q. Design a water supply scheme for new Railway colony based on the following data's. i. Requirement of Loco and domestic consumption 5 lacs gallon per day. ii. Source of wat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd