Q. What is Over vibration of fresh concrete?
For proper compaction of concrete by immersion vibrators, vibrating part of the vibrators must be completely inserted into the concrete. The action of compaction is enhanced by providing a sufficient head of concrete above the vibrating part of vibrators. This serves to push down and subject the fresh concrete to confinement within the zone of vibrating action.
Over-vibration must generally be avoided at the time of the compaction of concrete. If concrete mix is designed with low workability,over-vibration basically consumes extra power of vibration andleads to wastage of energy. For most of concrete mixes, over-vibration causes the problem of segregation in that denser aggregates settle to the bottom whereas the lighter cement paste is likely to move upwards. If concrete structure is cast by successive lifts of concrete pour, upper weaker layer (or laitance) caused by segregation forms potential plane of weakness resulting in possible failure of concrete structure during operation. If concrete is located in a single lift for road works, resistance to abrasion is poor for laitance surface of the carriageway. This becomes a serious problem to concrete carriageway where its surface is constantly subject to tearing and traction forces exerted by vehicular traffic.
Landslides induced by rainfall After rainfall, groundwater pressure is built up and this elevates ground water table. Water inside the pores of soil reducesthe effective stres
comparision of b.m & s.f
what is framework
High-yield steel vs. mild steel as road reinforcement High yield steel is the preferred material for the reinforcement of concrete carriageway due to the subsequent reasons:
Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km
what are obstacles in chaining
Hi need help with designing a 10 story concrete building with basement car park. Need help with calculations in line with eurocodes. Is this something you can help with?
An I-section beam 350*200mm2 has a web thickness of 12.5mm & a flange thickness of 25mm. It carries a shearing force of 200KN at a section. Sketch the shear stress distribution acr
Q. What are Service reservoirs? Service reservoirs, other than normal reservoirs are provided due to the subsequent reasons: (i) In case of breakdown of pumping stations a
A square pile group of 16 piles passes by a filled up soil of 3 m depth. The pile diameter is 25 cm and pile spacing is 75 cm. If the unit cohesion of the material is 18 kN/m 2 an
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd