Define the term - clamp splice, Civil Engineering

Assignment Help:

Define the term - Clamp splice

In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tightened with the help of bolts and nuts, as shown in Figure There is a considerable reduction in the tensile strength of tendons (say, utpo 50%) due to the use of this splice. This is why, the use of this type of splice is recommended in locations where the prestressing force may be sufficiently reduced, e.g. due to the curvature of tendons.

1796_Clamp splice.png


Related Discussions:- Define the term - clamp splice

Water bound macadam road, What is the binding material of the water bound m...

What is the binding material of the water bound macadam road

Define the arrow diagramming method, Define the Arrow Diagramming Method ...

Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on

Explain plate loading test, Q. Explain Plate loading test? In general i...

Q. Explain Plate loading test? In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of f

Shear stress, shear stress numerical of T section & I section to find maxim...

shear stress numerical of T section & I section to find maximum shear stress

Pavements with Bitumen Emulsion, What is the rate of application of Prime c...

What is the rate of application of Prime coat over WBM

Mechanics of solids assignment, What will be the cost of Mechanics of solid...

What will be the cost of Mechanics of solids assignment consisting of 150 questions of 6 marks

Road pavement, whatis difference between premix asphalt carpeting and aspha...

whatis difference between premix asphalt carpeting and asphalt concrete pavement

Scour, Q. What do you mean by Scour? Whenever a bridge crosses a waterw...

Q. What do you mean by Scour? Whenever a bridge crosses a waterway, even a small or intermittent one, scour is a dangerous effect that can damage bridge piers and undermine fou

Maintenance of earth roads, Maintenance of Earth Roads: The main task...

Maintenance of Earth Roads: The main task in maintaining the earth road is to ensure that cross-section is intact and is free from rutting, depressions and corrugations, and

Survey 1, describe how you would range a surveying line betwen two point wi...

describe how you would range a surveying line betwen two point wich are not entervisible?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd