Define the term - clamp splice, Civil Engineering

Assignment Help:

Define the term - Clamp splice

In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tightened with the help of bolts and nuts, as shown in Figure There is a considerable reduction in the tensile strength of tendons (say, utpo 50%) due to the use of this splice. This is why, the use of this type of splice is recommended in locations where the prestressing force may be sufficiently reduced, e.g. due to the curvature of tendons.

1796_Clamp splice.png


Related Discussions:- Define the term - clamp splice

Estimating, a 45 cm deep roof beam is provided on 30 cm wall of a room size...

a 45 cm deep roof beam is provided on 30 cm wall of a room size 3.0m*5.0m . calculate the quantity of steel required in beam on percentage basis.

Cross Section Method, Cut and Fill Calculation Using Cross Section Method

Cut and Fill Calculation Using Cross Section Method

Steel structures, how does battening differ from lacing?

how does battening differ from lacing?

Uses of bricks, Uses of Bricks In the following civil works Bricks are ...

Uses of Bricks In the following civil works Bricks are used: a. in building blocks. b. For lining of ovens, chimneys and furnaces. c. As aggregates in providing water

Define the finish-to-start dependency, Sheet rock cannot be installed in th...

Sheet rock cannot be installed in the new house you are building until a building inspector approves the plumbing, electrical, HVAC, and insulation.  This is an example of:

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Compaction, describe how quality control is maintained in a rolled fill dam...

describe how quality control is maintained in a rolled fill dam

Reasons for blockage in pumping concrete, Q. Reasons for blockage in pumpin...

Q. Reasons for blockage in pumping concrete ? Concrete pumping is normally adopted in highly elevated locations for which access for concrete trucks is difficult. Construction

Estimation, What are the various methods of recording measurements? List fi...

What are the various methods of recording measurements? List five items each for various methods of recoding measurements?

Roads construction in marshy land, precaution to be taken for roads constru...

precaution to be taken for roads construction in marshy land

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd