Diffrence between rowe cell and oedometer apparatus, Civil Engineering

Assignment Help:

Q. Diffrence between Rowe cell and Oedometer apparatus?

The benefits of using Rowe cell over oedometer apparatus are: 

(i)  It possesses control facilities for drainage and for measurement of pore water pressure.

(ii) It is capable of testing larger diameter soil samples. Therefore more reliable data can be provided by using Rowe's cell due to the relatively smaller effect of structural viscosity in larger specimens.

(iii)Rowe cell uses hydraulic loading system that is less susceptibleto effect of vibration than oedometer apparatus.


Related Discussions:- Diffrence between rowe cell and oedometer apparatus

Borrow pits - embankment construction, Borrow Pits Borrow pits are th...

Borrow Pits Borrow pits are the locations from where the embankment soil is obtained. The following guidelines govern the location of borrow pits : (a) They should be pref

Geological classification of stones, Geological Classification Based on...

Geological Classification Based on their beginning of formation stones are classified into 3 main groups-Igneous, sedimentary and metamorphic rocks. Igneous Rocks: Thes

Total station, describe in detail the various parts of a total station

describe in detail the various parts of a total station

Illustrate the term - failure due to rupture of steel, Failure Due to Ruptu...

Failure Due to Rupture of Steel This mode of  failure is likely in lightly reinforced concrete members in which the ultimate strength of  steel is attained before the concrete

What is collocated network operation, What is Collocated network operation ...

What is Collocated network operation As wireless LANs become more popular, it is likely for two or more wireless LANs to operate in the similar area or in some area where inter

Explain the perception reaction time, Explain the Perception Reaction Time ...

Explain the Perception Reaction Time A significant variable in the successful processing and use of information is the speed with which this is done. Perception-Reaction Time (

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Design the 2-span continuous center, Design the 2-span continuous center T-...

Design the 2-span continuous center T-beam, B2, for the floor syetem shown below. The girders that the beam frames into are all 24" wide. Using fc'= 5 ksi, and fy = 60 ksi. The ser

Uses of stones, Uses of Stones Stones are used in the following civil e...

Uses of Stones Stones are used in the following civil engineering constructions are described: (i) Stone masonry which is used for the construction of foundations, , columns

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd