Q. How can a temporary diversion to laid a cross flowing river in case of disruption to rail traffic over a major bridge lasting over 6 months. Ans.- Temporary diversion
Pavement Width: The pavement widths commonly adopted are : Single lane : 3.75 m Intermediate lane : 5.5 m Two lane
Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was
why is it done.
Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin
State the term - Relaxation of Stress in Steel If we keep a high-tensile steel wire stretched and maintained at a constant strain, the value of the force in the wire does not
What is the station at Point B? SOLUTION 3 Station at Point A = Sta 22+45 Station at Point B = (Sta 22+45) + 1028' = 2245'+1028' =3273' = Sta 32+73
SHEAR STRESS DISTRIBUTION INTO CIRCULAR SECTION DERIVATION
Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique
A partially saturated soil from an earth fill has a natural water content of 19% and a bulk unit weight of 19.33 kN/m 3 . Suppose the specific gravity of soil solids as 2.7, comput
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd