Execution compression test for concrete, Question In execution compression...

Question In execution compression test for concrete , have to test cubes .Test cylinders be approved? Answer Essentially, results of compression test carried out by using cu

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Chain surveying, describe setting out right angle at given point on a chain...

describe setting out right angle at given point on a chain line and when the point lies outside the chain line

Highway Engineering, I am a Civil Engg student. Why CBR Values determined ...

I am a Civil Engg student. Why CBR Values determined only at 2.5 and 5 mm penetration ?.

Moment, what is a couple?

what is a couple?

Float or slack of an activity is positive or negetive, 1. What take place w...

1. What take place when float or slack of an activity is positive Ans: It represents a situation where extra resources are available and the completion of the project is not de

Fluid mechanics, why converjent angle is greater than disconverjent angle

why converjent angle is greater than disconverjent angle

Illustrate bituminous surfacing over concrete structures, Q. Illustrate Bit...

Q. Illustrate Bituminous surfacing over concrete structures? Usage of bituminous surfacing over concrete structures (for instance existing concrete roads) is widespread to impr

Earth fill dams, Ask question #Minimum 100E. The regulations and specificat...

Ask question #Minimum 100E. The regulations and specifications that followed for compaction works for earth dam in Oman words accepted#

Emulsion - road materials, Emulsion: An emulsion is a bituminous bind...

Emulsion: An emulsion is a bituminous binder which is in a fluid form at atmospheric temperatures above O o C and requires no heating at all. Bitumen cab be converted to an e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd