QuestionWhile designing sewer pipes, why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe size more than 600mm?
AnswerMarket price of vitrified clay pipes is usually less than that of precast concrete pipes with PVC coating. So, for little size of pipes as pipe diameter less than 600mm, it is more cost-effective to use vitrified clay pipes. Though, vitrified clay pipes do experience from problem of brittleness and its effect is still severe for outsized size of pipes. Furthermore, it is somewhat time consuming to send clay pipes products since majority of them is manufactured in Europe. Therefore, for larger size of sewer pipes as diameter additional than 600mm, it is usual to use precast concrete pipes with PVC coating.
Describe 'general shear failure' and 'Local shear failure'. Differentiate among (i) Shallow foundation and deep foundation, (ii) Gross and net bearing capacity, (iii) S
Crack width limitation ( In many standards and code of practice of numerous countries, allowable size of crack width is generally limited to less than 0.5mm for reinforced conc
A continuous footing of width 2.5 m rests 1.5 m below the ground surface in clay. The unconfined compressive strength of the clay is 150 kN/m 2 . Measure the ultimate bearing ca
Define Limitations of Underwater Magnetic Particle Testing? As with any non-destructive test method, UWMT has some limitations as under: i. Underwater magnetic particle tes
explain ranging and reciprocal ranging
plz tell me the ratio of sand,aggregate,and asphalt.pl tell me the mm of aggregate
section of railway tracks in india ,all dimensions in meters
WHAT IS BITIMIOUS CONCRETE
HOW CAN I MAKE ASSIGNMENT ON THIS TOPIC
Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd