QuestionWhile designing sewer pipes, why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe size more than 600mm?
AnswerMarket price of vitrified clay pipes is usually less than that of precast concrete pipes with PVC coating. So, for little size of pipes as pipe diameter less than 600mm, it is more cost-effective to use vitrified clay pipes. Though, vitrified clay pipes do experience from problem of brittleness and its effect is still severe for outsized size of pipes. Furthermore, it is somewhat time consuming to send clay pipes products since majority of them is manufactured in Europe. Therefore, for larger size of sewer pipes as diameter additional than 600mm, it is usual to use precast concrete pipes with PVC coating.
Air Traffic Control: Importance of Air Traffic Control Air Traffic Control is a system by which routes for flying aircraft are defined, flight rules are framed, and f
The continuous one-way slab shown below is loaded with a uniform service live load of 80 psf, and a superimposed dead load of 40 psf. Assume the beam width is 16" and use f'c = 5 k
Need to know about compressive strength test and tensile strength test of cement
Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding to
construction detail of all types of flooring
use of rapid sand filter in grey water treatment units
Roads in Hilly Areas: (a) The alignment selected should attain the changes in elevation by adopting the ruling gradient to the maximum length. Limiting and exceptional
I want to ask about mathcad prime 2.0, when I want to save my work it shows that I can''t save it because Excel is busy ,, what I have to do to fix this problem ??
If the standard deviation of an observation is ± 10-ft, the most probable error would be: The most probable error is defined as the error for which there are equal chances of t
Question What is problem in traditional marine piling system of steel tubular pile with concrete infill and what are key possible remedial measures? Answer In design
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd