Question
While designing sewer pipes, why vitrified clay pipes commonly is used for pipe size less than 600mm still as precast concrete pipes with PVC lining is used for pipe size more than 600mm?

Answer
Market price of vitrified clay pipes is usually less than that of precast concrete pipes with PVC coating. So, for little size of pipes as pipe diameter less than 600mm, it is more cost-effective to use vitrified clay pipes. Though, vitrified clay pipes do experience from problem of brittleness and its effect is still severe for outsized size of pipes. Furthermore, it is somewhat time consuming to send clay pipes products since majority of them is manufactured in Europe. Therefore, for larger size of sewer pipes as diameter additional than 600mm, it is usual to use precast concrete pipes with PVC coating.

 


Related Discussions:- Designing sewer pipes

Determine the term - final tension, Determine the term - Final Tension ...

Determine the term - Final Tension The tension in tendons after losses of prestress have taken place is called as final tension. Final tension is taken to be corresponding  to

Wall method of estimation, 1. Can you enumerate the benefits of individual ...

1. Can you enumerate the benefits of individual wall method of estimation? 2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method? 3. Which met

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Shrinkage of concrete in prestressed members, Shrinkage of concrete in pres...

Shrinkage of concrete in prestressed members The shrinkage of concrete in prestressed members results in a shortening of ensioned wires and hence contributes to the loss of st

Determine the sweep angles and coordinates, This is more likely in to Aeros...

This is more likely in to Aerospace engineering.. So if there's anyone whose doing his/her major or have any skills regarding that field please help me with this problem. :) a)

Engineering Mechanics, the jet transport B is flying north with a velocity ...

the jet transport B is flying north with a velocity vB = 600 km/h when a smaller aircraft A passes underneath the transport headed in the 60 degree direction shown. To passengers i

Engineering indicators in case of multi speed restriction, Multi Speed Rest...

Multi Speed Restriction (i.e. existence of two or more than two speed restrictions in continuation) When work of deep screening or sleeper renewal is in progress, there is situ

Leveling., what is the errors faced in leveling

what is the errors faced in leveling

Construction of concrete carriageway, Question If construction of conc...

Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd