Interface between base plates and footings, Civil Engineering

Assignment Help:

Interface between base plates and footings

Surface of footings is generally quite rough so that some levelling has to be carried out for base plates. Interface between base plates and footings after levelling is later filled with grout. At the time of grouting, trapping of air can take place at the underside of base plates and this results in the formation of cavities and uneven contact surfaces on that base plates are rested. Some holes can be drilled in the base plate to avoid occurrence of air trapping.


Related Discussions:- Interface between base plates and footings

PORTAL FRAME, EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE...

EXPLAIN SITUATION OF THE PORTAL FRAME CAN CAUSE SWAY WITH THE AID OF A DIGRAM

Stones, what are the different type of stones?

what are the different type of stones?

Explain the suppressed rectangular weir, Explain the Suppressed Rectangular...

Explain the Suppressed Rectangular Weir If the length of the weir (b) equals the width of the channel, i.e., the flow is not "contracted".

#Friction, #Determine the smallest value of P and corresponding angle to th...

#Determine the smallest value of P and corresponding angle to the inclined plane which is inclined by 30 degree to horizontal to just start the block moving up the inclined plane.

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Explain standard penetration test used in soil exploration, Explain the "St...

Explain the "Standard Penetration Test" used in soil exploration. List the information that can be obtained by the test when made in (a) clay, (b) sand. Comment on the correctio

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Softening test point, the importance of softening point of a bitumen materi...

the importance of softening point of a bitumen material in the design of a pavement

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd