Explain Box jig?

a) The box jig is so named because of its box shaped construction, closed from most of the sides.

b) It is normally designed for those components having awkward shape and need machining in more than one plane.

2194_box jig.png

Figure: Box Jig

 


Related Discussions:- Explain box jig

What is core-barrel samplers, Q. Core-barrel samplers: single tube sampler ...

Q. Core-barrel samplers: single tube sampler vs. double tube sampler vs. triple tube sampler Core barrel samplers are initially designed to sample rock. In single tube sampler

Calculate the degree of saturation of the soil, A clay sample, having its n...

A clay sample, having its natural moisture content, weighs 0.333 N. The specific gravity of solids of this soil is 2.70. After oven-drying, the soil sample weighs 0.2025 N. The vol

Chemistry, Construction and working of calomel electrode

Construction and working of calomel electrode

Compute the included angles, Example. With a surveyor compass the ang...

Example. With a surveyor compass the angles observed in traversing the lines AB, BC, CD, DE and EF are  as. Compute the included angles and indicate them in a neat sketch.

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd