Explain Box jig?

a) The box jig is so named because of its box shaped construction, closed from most of the sides.

b) It is normally designed for those components having awkward shape and need machining in more than one plane.

2194_box jig.png

Figure: Box Jig

 


Related Discussions:- Explain box jig

PROJECT PROPOSAL, HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED C...

HOW CAN I INVESTIGATE THE PROPERTIES UNBURNT COMPRESSED CLAY BRICKS AND STABILIZED UNBURNT COMPRESSED BRICKS.

Large catchments in estimating peak runoff, Question Is it true that ra...

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme

Two way slab, how can i design reinforcement for a two way slab

how can i design reinforcement for a two way slab

Aggregates, list the properties of aggregates

list the properties of aggregates

Define Statically indeterminate structures, Statically indeterminate struct...

Statically indeterminate structures a. Fall into two categories: 1.  Beam problems with additional supports/restraints 2.  Axial bar members subjected to temperature/forc

State the term - total loss of prestress, Total loss of prestress The ...

Total loss of prestress The total amount of losses of prestresses may be accounted for in a prestressed concrete member by adding different losses which may take place for tha

Define inspection of steel or cast iron substructures, Define Inspection of...

Define Inspection of Steel or Cast Iron Substructures? Corrosion is the principal cause of deterioration in steel waterfront substructures. On bare un-protected steel pilings,

Explain gap survey and adjustment of gap, Q. Explain Gap Survey and adjustm...

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

Highway economics, What is highway economics and what are its main contents...

What is highway economics and what are its main contents to study ?

Verify the optimum value of the spacing of the piles, A 16-pile group has t...

A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd