Explain Box jig?

a) The box jig is so named because of its box shaped construction, closed from most of the sides.

b) It is normally designed for those components having awkward shape and need machining in more than one plane.

2194_box jig.png

Figure: Box Jig

 


Related Discussions:- Explain box jig

Steel tubular marine piles, Question Give genuine reason that why are ...

Question Give genuine reason that why are steel tubular marine piles often driven open-ended? Answer In marine structure where piles are constantly topic to major la

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

Designing of retaining walls, Question What is function of shear keys in d...

Question What is function of shear keys in designing of retaining walls ? Answer In formative external constancy of retaining walls, failure modes similar to bearing failure, s

Wearing course or additional thickness be designed on piers, Question S...

Question Shall layer of wearing course or additional thickness be designed on surface of piers ? Answer In designing of piers , considerations have to be given to

Culverts - causeway and bridges, Culverts, Causeway and Bridges: Roads...

Culverts, Causeway and Bridges: Roads have to cross several natural streams like - rivers and canals. They also have to cross railway lines and cross-roads. The structures nee

Structure analysis, In a cantilever truss it is very essential to find out ...

In a cantilever truss it is very essential to find out the reactions before analyzing it.

Designing level of landings in piers, Question What is designing leve...

Question What is designing level of landings in piers? Answer Landings are designed as resting place for passengers throughout berthing and deserting of vessels. I

Determine the total head and total pressure of water, Determine the total h...

Determine the total head and total pressure of water flowing at  in a pipe which has the following data: Flow= 2,500 gpm; Elevation = 30 ft; Pressure = 40 psi; Pipe Diameter =

Calculate the number of trucks for fleet working, A contractor was awarded ...

A contractor was awarded a Contract to excavate and haul 200,000-yds 3 of silty clay (USCS classification ML) with a bulking factor of 30%.  The contractor's fleet of dump trucks

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd