Explain box jig, Civil Engineering

Assignment Help:

Explain Box jig?

a) The box jig is so named because of its box shaped construction, closed from most of the sides.

b) It is normally designed for those components having awkward shape and need machining in more than one plane.

2194_box jig.png

Figure: Box Jig

 


Related Discussions:- Explain box jig

Changeable depth bridge decks, Question What is the sucker deck principle f...

Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greater tha

Quality control in flexible pavements, Quality Control in Flexible Pavement...

Quality Control in Flexible Pavements: The quality control needed for Flexible Pavements covers the following tests : (a) Density and Moisture content of sub-grade. (b)

Bituminous concrete, Bituminous Concrete: Bituminous Concrete (BC) is...

Bituminous Concrete: Bituminous Concrete (BC) is a hot-mix superior type of bituminous surfacing, having a low voids (3-5 per cent), good durability high imperviousness and g

What do you mean by elastomeric bearings, Q. What do you mean by Elastomeri...

Q. What do you mean by Elastomeric bearings? Steel bearings are good but suffer from problems of corrosion and high level of maintenance. Due to these problems of steel bearing

Why we use air valves, Q. Why we use Air Valves? Air Valves - Air valve...

Q. Why we use Air Valves? Air Valves - Air valves of proper size and pressure rating at summits. Air valves ensure the safety of the pipe line against collapse when at points o

What is gravity flow, Gravity flow is fluid flowing because of the forces o...

Gravity flow is fluid flowing because of the forces of gravity alone and not to an applied pressure head. In the Bernoulli equation, the pressure term is omitted, and the height an

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Two pegs test, the distance between two pegs M and N is 7,063 as measured o...

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

Determining the amount of pre-camber, 1. Domes - You are a construction man...

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd