Calculates the energy required, Civil Engineering

Assignment Help:

Write a program called, A1Q1, that reads a single letter.   It will then display the corresponding ASCII code of the letter and prints the next character and the character which is corresponding to the "ASCII code + 3".  Comment on the unusual behaviour if you enter 'z' or 'Z' or '9' or '@'.  Shorthand operators and increment/decrement operators should be used in your code.

2. Write a program called A1Q2, that calculates the energy needed to heat water from an initial temperature to a final temperature. Your program should prompt the user to enter the volume of water in gallons and the initial and final temperatures in Fahrenheit. The formula to compute the energy isenergy = mass * (temperatureFinal - temperatureInitial ) * 4184 where 'mass' is in Kg; temperatures are in degrees Celsius and  'energy' is in J.  You will need to convert the inputs to the proper units (1 gallon = 3.785 litres).  Use constants not numeric literals to define physical constants and conversion factors.  What happens if the user enters the values as octal or hexadecimal numbers?

Here is a sample run:

Enter the amount of water in gallons: 11.5 

Enter the initial temperature in F: 55.2 

Enter the final temperature in F: 78.5 

To heat the water of 43.5275 kg from 12.8889 C to 25.8333 C, the required energy is 2357.43 KJ.


Related Discussions:- Calculates the energy required

State the design process of prestressed concrete, State the Design process ...

State the Design process of Prestressed Concrete Most of the times, the design process is an interactive and trial procedure in which the cycle of analysis - design - analysis

Define the types of sedimentation, Define the Types of Sedimentation 1....

Define the Types of Sedimentation 1. Type I Particles that settle discretely (settle as individual particles) sand, grit Pre-sedimentation for sand prior to co

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

Water supply, give a short description about water supply system

give a short description about water supply system

Key role of drilling fluid in rotary drilling, Question What is key rol...

Question What is key role of drilling fluid in rotary drilling in site search? Answer Drill fluid in rotating serves two main reasons. (i) Facilitate rotation of

Brick pavement, Brick Pavement: In regions where stone aggregates are...

Brick Pavement: In regions where stone aggregates are not available within economical leads, bricks provide a cheaper alternative. Flat-brick or brick-on-edge pavements provi

Benefits of analysis of prestress and bending stresses, Normal 0 ...

Normal 0 false false false EN-IN X-NONE X-NONE

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd