Calculates the energy required, Civil Engineering

Assignment Help:

Write a program called, A1Q1, that reads a single letter.   It will then display the corresponding ASCII code of the letter and prints the next character and the character which is corresponding to the "ASCII code + 3".  Comment on the unusual behaviour if you enter 'z' or 'Z' or '9' or '@'.  Shorthand operators and increment/decrement operators should be used in your code.

2. Write a program called A1Q2, that calculates the energy needed to heat water from an initial temperature to a final temperature. Your program should prompt the user to enter the volume of water in gallons and the initial and final temperatures in Fahrenheit. The formula to compute the energy isenergy = mass * (temperatureFinal - temperatureInitial ) * 4184 where 'mass' is in Kg; temperatures are in degrees Celsius and  'energy' is in J.  You will need to convert the inputs to the proper units (1 gallon = 3.785 litres).  Use constants not numeric literals to define physical constants and conversion factors.  What happens if the user enters the values as octal or hexadecimal numbers?

Here is a sample run:

Enter the amount of water in gallons: 11.5 

Enter the initial temperature in F: 55.2 

Enter the final temperature in F: 78.5 

To heat the water of 43.5275 kg from 12.8889 C to 25.8333 C, the required energy is 2357.43 KJ.


Related Discussions:- Calculates the energy required

Calculate the percent change in load on the wall form tie, A concrete wall ...

A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspect

Basic considerations governing selection of road alignment, Basic Considera...

Basic Considerations Governing Selection of Road Alignment: The following considerations shall be kept in view in selecting the road alignment: Roads in Plain Areas (a)

Embankment construction, Embankment Construction: Selection of Soil...

Embankment Construction: Selection of Soil Soil is the material used for embankment construction, though other materials like rock and fly-ash are also used in specia

Determine the uses of full prestressing, Determine the uses of Full Prestre...

Determine the uses of Full Prestressing A prestressed concrete structural member is said to be fully prestressed if sufficient prestresses are introduced so that  tensile stres

Force systems and equlibrium, write short notes about force systems and equ...

write short notes about force systems and equilibrium

W.M.M., What is W.M.M. roads? Where its used ?

What is W.M.M. roads? Where its used ?

Cavities under structures., This is the title for my thesis for masters in ...

This is the title for my thesis for masters in structural engineering. Is it possible to make for me the literature review? I already have my references.

Explain about noise absorptive materials, Q. Explain about Noise absorptive...

Q. Explain about Noise absorptive materials? The fundamental mechanism of noise absorptive material is to change the acoustic energy into heat energy. Amount of heat produced i

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd