Calculates the energy required, Civil Engineering

Assignment Help:

Write a program called, A1Q1, that reads a single letter.   It will then display the corresponding ASCII code of the letter and prints the next character and the character which is corresponding to the "ASCII code + 3".  Comment on the unusual behaviour if you enter 'z' or 'Z' or '9' or '@'.  Shorthand operators and increment/decrement operators should be used in your code.

2. Write a program called A1Q2, that calculates the energy needed to heat water from an initial temperature to a final temperature. Your program should prompt the user to enter the volume of water in gallons and the initial and final temperatures in Fahrenheit. The formula to compute the energy isenergy = mass * (temperatureFinal - temperatureInitial ) * 4184 where 'mass' is in Kg; temperatures are in degrees Celsius and  'energy' is in J.  You will need to convert the inputs to the proper units (1 gallon = 3.785 litres).  Use constants not numeric literals to define physical constants and conversion factors.  What happens if the user enters the values as octal or hexadecimal numbers?

Here is a sample run:

Enter the amount of water in gallons: 11.5 

Enter the initial temperature in F: 55.2 

Enter the final temperature in F: 78.5 

To heat the water of 43.5275 kg from 12.8889 C to 25.8333 C, the required energy is 2357.43 KJ.


Related Discussions:- Calculates the energy required

Define the arrow diagramming method, Define the Arrow Diagramming Method ...

Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on

Pavement design, differences between highway pavement and airfield pavement...

differences between highway pavement and airfield pavement

Quality control of concrete roads, Quality Control of Concrete Roads: ...

Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an

Retaining wall, I retained the soil in my yard by brick with 3 levels to a...

I retained the soil in my yard by brick with 3 levels to avoid sliding the soil to the street. the appeared part of the bricks from each level is 3 feet and less.The hidden part o

WATER SUPPLY, THE DESIGN PERIOD AVERAGE DAILY DEMAND CALCULATE. THE DESIGN ...

THE DESIGN PERIOD AVERAGE DAILY DEMAND CALCULATE. THE DESIGN DEMAND FOR THE WATER RETICULATION OR DISTRIBUTION PERIOD.

Explain horizontal circular curves - transportation, Explain Horizontal Cir...

Explain Horizontal Circular Curves - Transportation Horizontal circular curve is a circular arc between two straight lines known as tangents.

Industrial steel floor fire proof, i want to know the construction details ...

i want to know the construction details of industrial steel floor?

Well foundation in bridges, what is the purpose of 6mm ms sheet for stainin...

what is the purpose of 6mm ms sheet for staining in various conditions at inner &outer of well

Define the pre-tensioned concrete construction, Define the pre-tensioned co...

Define the pre-tensioned concrete construction We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd