Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Write a program called, A1Q1, that reads a single letter. It will then display the corresponding ASCII code of the letter and prints the next character and the character which is corresponding to the "ASCII code + 3". Comment on the unusual behaviour if you enter 'z' or 'Z' or '9' or '@'. Shorthand operators and increment/decrement operators should be used in your code.
2. Write a program called A1Q2, that calculates the energy needed to heat water from an initial temperature to a final temperature. Your program should prompt the user to enter the volume of water in gallons and the initial and final temperatures in Fahrenheit. The formula to compute the energy isenergy = mass * (temperatureFinal - temperatureInitial ) * 4184 where 'mass' is in Kg; temperatures are in degrees Celsius and 'energy' is in J. You will need to convert the inputs to the proper units (1 gallon = 3.785 litres). Use constants not numeric literals to define physical constants and conversion factors. What happens if the user enters the values as octal or hexadecimal numbers?
Here is a sample run:
Enter the amount of water in gallons: 11.5
Enter the initial temperature in F: 55.2
Enter the final temperature in F: 78.5
To heat the water of 43.5275 kg from 12.8889 C to 25.8333 C, the required energy is 2357.43 KJ.
study of cross staff
how to calculate a slope
Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki
which IS code give details about Strength of Brick?
Please advise what is the proportion of mix to achieve 45N/sq. mm compressive strength with 370Kg.SR cement per cubic meter and 35N/Sq.mm strength with OPC cement 330 kg per cubic
An earthwork contract was awarded to excavate and backfill the foundation of a proposed 50-ft by 50-ft office building. The existing grade elevation is 437.5-ft while the sub-base
State the method of Pre- Tensioning It is a method of prestressing concrete in which tendons are stretched or tensioned before concreting. In this form of construction, concr
Specify the various methods of soil exploration and mention the circumstances under which each is best suited. What do you mean by undisturbed sample? Define with a neat sketch
Determine about the pre-stressed concrete beam A pre-stressed concrete beam has a width of 200 mm and an overall depth of 400 mm. The permissible stresses in tension and compre
Define the term - Cracking Load and Proof Stress Cracking Load The load on the structural member at the time of the initiation of first visible crack in concrete is know
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd