Explain the Rippl Diagram or Mass Diagram

For a potable water reservoir, it is the simultaneous plots of the cumulative inflow and cumulative water consumption/demand, termed "draft" in units of volume (y-axis) vs. consecutive hours, days, months or years (x- axis). In these types of problems, water demand will be at a constant rate to generate a straight, constant sloped line on the plot.

The cumulative inflow will be a curved plot based on gains and losses to the reservoir. The storage volume needed is the separation between a trough (low point on the plotted curve) and a peak (inputs greater than the demand . At some high point on the plotted curve will indicate when reservoir capacity is full releasing water over the spillway may be necessary.


Related Discussions:- Explain the rippl diagram or mass diagram

On-line storage vs. off-line storage, On-line storage vs. off-line storage ...

On-line storage vs. off-line storage Design of storage pond is commonly divided into off -line storage and on-line storage. The on-line storage concept includes inclusion of s

Diagrids, can we provide base isolation for high rise buildings ? Can we pr...

can we provide base isolation for high rise buildings ? Can we provide it for diagrid structures? if; yes Up to which no of storeys

Civil and statistics, application of normal distribution in civil engineeri...

application of normal distribution in civil engineering

Which is stronger solid steel rod or hollow steel pipe, On a per pound basi...

On a per pound basis, steel pipe is stronger in bending and is less likely to buckle in axial compression.

Velocity distribution and flow formulae, Q. Velocity distribution and flow ...

Q. Velocity distribution and flow formulae? Variation in velocity along a vertical in channel cross section is known to follow logarithmic distribution, maximum velocity being

Explain the statements about the differential levelling, Explain the Statem...

Explain the Statements about the Differential Levelling I.  Bench mark (BM) - relatively permanent point of known elevation as indicated on the Contract drawings  II. Back s

Non-distortional prestressing, Non-distortional Prestressing Concrete m...

Non-distortional Prestressing Concrete members deflect due to their own self weight. If prestressing force is applied in such a way that these deflections are eliminated due to

Explain the maximum spacing of piles, Q. Explain the Maximum spacing of pil...

Q. Explain the Maximum spacing of piles? One of the factors which affect the distribution of loads from the structures to each pile is assumption of flexibility of the pile ca

Foundation, write the types of foundation for black cotton soil and exxplin...

write the types of foundation for black cotton soil and exxplin with drowing?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd