Total station - uses and mining:
Uses:-
Total stations are mainly used by land surveyors and Civil Engineers, either to record features as in Topographic Surveying or to set out features (such as roads, houses or boundaries). They are also used by archaeologists to record excavations and by police, crime scene investigators, private accident reconstructionists and insurance companies to take measurements of scenes.
Mining:-Total stations are the primary survey instrument used in miningsurveying. A total station is used to record the absolute location of the tunnel walls , ceilings (backs), and floors as the drifts of an underground mine are driven. The recorded data are then downloaded into a CAD program, and compared to the designed layout of the tunnel.
The survey party installs control stations at regular intervals. These are small steel plugs installed in pairs in holes drilled into walls or the back. For wall stations, two plugs are installed in opposite walls, forming a line perpendicular to the drift. For back stations, two plugs are installed in the back, forming a line parallel to the drift.
A set of plugs can be used to locate the total station set up in a drift or tunnel by processing measurements to the plugs by intersection and resection.
an opening of width 3m and height 2.7 in a brick masonary has to be provided with door cum window. plan, elevation, section and 2 joining details
limitations of EIA
problems
You wish to buy a house and you can afford to make a down payment of $50,000. Your monthly mortgage payment cannot exceed $2,000. If 30-year loans are available at 7.5% annual inte
Question Is procurement of third party insurance required to be incorporated in deal for construction works? Answer Purpose of third party insurance is to guard contra
langkah keselamatan
A wastewater plant is operating at 10MGD with a suspended solids concentration of 200mg/L. It has 6 clarifiers operating in parallel. Each clarifier is 40 foot in diameter and 10 f
State about the pre-tensioned concrete In pre-tensioned concrete, the tendon stresses are transferred to concrete by virtue of bond of concrete to the surface of steel tend
what is reciprocal method?
Q. Defaults for precast concrete pipes made by spinning? Small diameter precast concrete pipes are generally manufactured by spinning method. The spinning method fundamentally
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd