Ceramic tiles for construction material, Civil Engineering

Assignment Help:

Q. Ceramic Tiles for construction material?

For public toilet bath rooms , kitchen etc to ensure cleanliness floors should be provided with ceramic tile.

For water points on P. F. may be lined with cheaper ceramic tiles.

When providing ceramic tiles in flooring or in dados the size and the place in which they are being provided is of extreme importance is deciding size of the ceramic tiles . For walls large rooms verandah etc the size of these tiles should not be less than 30 cm x 30 cm except that minimum size may be in some cases 20 cm x 20 cm or 20 cm x 10 cm ceramic tiles may be used.


Related Discussions:- Ceramic tiles for construction material

Comparing speed, Question Comparing speed of "Formwork exceeding 300mm wide...

Question Comparing speed of "Formwork exceeding 300mm wide, horizontal and at any inclination up to and including 5o to horizontal" with speed of "Formwork exceeding 300mm wide, at

Digit of cells for concrete box girder bridges, Question How does an engine...

Question How does an engineer determine digit of cells for concrete box girder bridges ? Answer If depth of a box girder bridge exceeds 1/6 or 1/5 of bridge width, then it is o

Determine the factor of safety against overturning, A trapezoidal masonry r...

A trapezoidal masonry retaining wall 1 m wide at top and 3 m wide at its bottom is 4 m high. The vertical face is retaining soil (φ = 30°) at a surcharge angle of 20° with the hori

#titl, Two readings ie 1.64m and 0.73m were taken during leveling procedure...

Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line

Examples of stabilised pavement layers, Examples of Stabilised pavement lay...

Examples of Stabilised pavement layers: Examples Sand-clay mixture Sand-gravel mixture Soil-aggregate mixture Soil-soft aggregate mixtures (b)

Diver qualification - diving operation for bridge inspection, Define Diver ...

Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates

Calculate the daily standard production rate of equipment, Calculate the Da...

Calculate the Daily Standard Production Rate of Equipment An excavator with a bucket capacity of 3-yd 3 has a standard operating cycle time of 40 seconds. The daily standard p

Rb slab, #questionshow me picture..

#questionshow me picture..

Wall, picture of types of wall

picture of types of wall

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd