For public toilet bath rooms , kitchen etc to ensure cleanliness floors should be provided with ceramic tile.

For water points on P. F. may be lined with cheaper ceramic tiles.

When providing ceramic tiles in flooring or in dados the size and the place in which they are being provided is of extreme importance is deciding size of the ceramic tiles . For walls large rooms verandah etc the size of these tiles should not be less than 30 cm x 30 cm except that minimum size may be in some cases 20 cm x 20 cm or 20 cm x 10 cm ceramic tiles may be used.


Related Discussions:- Ceramic tiles for construction material

Track design for line speed improvements, The objective of this module is:-...

The objective of this module is:- For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibil

Calculate the pressure on the other end, Q. 50 liters per sec of water flow...

Q. 50 liters per sec of water flow in a horizontal pipeline which is 200m long and the centerline of which is 3 m above the datum line. The pipe tapers from 30 cm diameter to 20 cm

Bricks properties, what is the application of silica,aluminaand magnesium i...

what is the application of silica,aluminaand magnesium in bricks?

Forces reactions at that point, Mad/Sir What would be the Horizontal and ve...

Mad/Sir What would be the Horizontal and vertical component from this acting force see diagram

Uses of cement, Uses of Cement Cement is utilized widely for the constr...

Uses of Cement Cement is utilized widely for the construction of several structures. Some of them are listed below: (i) Cement slurry is utilized for filling cracks in concr

Bending moments& shear force, calculate bending &shear force of 16kn/m and ...

calculate bending &shear force of 16kn/m and draw the shear force and bending moment diagrams

Yugty, #quesjjhjhhjtion..

#quesjjhjhhjtion..

Unsymmetrical bending, An 8 kN.m moment is applied at the end of a block fi...

An 8 kN.m moment is applied at the end of a block fixed into the ground as illustrated in thefigure below. The moment vector (double arrow head representation) acts in line with th

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd