Ceramic tiles for construction material, Civil Engineering

Assignment Help:

Q. Ceramic Tiles for construction material?

For public toilet bath rooms , kitchen etc to ensure cleanliness floors should be provided with ceramic tile.

For water points on P. F. may be lined with cheaper ceramic tiles.

When providing ceramic tiles in flooring or in dados the size and the place in which they are being provided is of extreme importance is deciding size of the ceramic tiles . For walls large rooms verandah etc the size of these tiles should not be less than 30 cm x 30 cm except that minimum size may be in some cases 20 cm x 20 cm or 20 cm x 10 cm ceramic tiles may be used.


Related Discussions:- Ceramic tiles for construction material

Key role of drilling fluid in rotary drilling, Question What is key rol...

Question What is key role of drilling fluid in rotary drilling in site search? Answer Drill fluid in rotating serves two main reasons. (i) Facilitate rotation of

Show the overlays on concrete bridge deck, Q. Show the Overlays on concrete...

Q. Show the Overlays on concrete bridge deck? After years of servicing, some overlays can be applied on the top surface of bridges. Overlays on concrete bridge decks achieve th

Most aggregate size advantage structures, Question Design of concrete struc...

Question Design of concrete structures, normally most aggregate sizes are adopted with scopes from 10mm to 20mm. Does an increase of most aggregate size advantage structures ?

Reinforcement in thrust blocks, Reinforcement in thrust blocks In gene...

Reinforcement in thrust blocks In general situation, reinforcement isn't essential for thrust blocks in pressurized pipelines. Though certain amount of reinforcement hasto be

What is the density index of the natural soil, A sand at a borrow pit is de...

A sand at a borrow pit is determined to have an  in-situ dry unit weight of 18.4 kN/m 3 . Laboratory tests indicate the maximum and  minimum unit weight values of 19.6 kN/m 3 and

Numericals on settlement of foundation, A footing foundation for a water to...

A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla

Distomat, definition,old&new modern&difference

definition,old&new modern&difference

Calculate the percent grade of line, 1. The topography of a local valley is...

1. The topography of a local valley is shown. The horizontal distance between point P and Q is 11,456-ft. The percent grade (%) of line P-Q .     2. Based on the info

Machanics, write a short on vector representation of force(addition and sub...

write a short on vector representation of force(addition and substraction )

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd