Q.What do you mean by Slip Siding?

If the Station yard is in a gradient steeper than 1 in 260 or there is a continuous falling gradient away from the station there is a possibility of vehicles standing in the yard entering or escaping into the block section and cause accidents to prevent such escaping of vehicles into the block section slip siding are provided.

At a station where there is a gradient 1 in 100 falling away from the station within 45 meters beyond the outer most points at either end a slip siding should be provided.

As per the schedule of dimensions no station yard should be constructed nor should any siding join a passenger line on a steeper grade than 1 in 260 except where it is unavoidable and then only with the previous sanction of the railway board obtained through the commissioner of Railway safety when a slip siding is made sufficient prevent accident.


Related Discussions:- What do you mean by slip siding

Role of rebate in typical construction joint, Question What is role of reba...

Question What is role of rebate in typical construction joint ? Answer Construction joints are formed on sites to facilitate construction procedure. Though, if improperly constr

Reinforced Concrete Design, design a 3-meter cantilever slab to carry a uni...

design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.

WMM, gradation of materials used in wet mix macadam

gradation of materials used in wet mix macadam

Levelling, difference between fly levelling and differential levelling

difference between fly levelling and differential levelling

Why do we need to control air pollution, Why do we need to control air poll...

Why do we need to control air pollution? a. It causes harmful effects on human health,  Materials and property,  Plants and Animals, Visibility, Global climate and others b.

Transit sheds and warehouses, Transit Sheds and Warehouses: These are ...

Transit Sheds and Warehouses: These are sheds constructed as steel frames or RCC frames with a steel truss, with galvanised iron or asbestos cement sheets. Transit sheds may b

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Continuous flow systems, Continuous Flow Systems: Transport by road, r...

Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those

Construction material, 4. Calculate the loose volume of material needed to ...

4. Calculate the loose volume of material needed to fill in the trench as sketched below. The following information is also known: [7] o Length of trench = 250 m o Trench

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd