If the Station yard is in a gradient steeper than 1 in 260 or there is a continuous falling gradient away from the station there is a possibility of vehicles standing in the yard entering or escaping into the block section and cause accidents to prevent such escaping of vehicles into the block section slip siding are provided.

At a station where there is a gradient 1 in 100 falling away from the station within 45 meters beyond the outer most points at either end a slip siding should be provided.

As per the schedule of dimensions no station yard should be constructed nor should any siding join a passenger line on a steeper grade than 1 in 260 except where it is unavoidable and then only with the previous sanction of the railway board obtained through the commissioner of Railway safety when a slip siding is made sufficient prevent accident.


Related Discussions:- What do you mean by slip siding

Softening point test, Softening Point Test: The temperature at which ...

Softening Point Test: The temperature at which bitumen softens is determined by the "Ring and Ball" test (Figure). (a) Diagram of Apparatus at Beginning of Test  (b

Define fatigue load test of shock transmission unit, Define Fatigue load te...

Define Fatigue load test of shock transmission unit? This test was carried out for 100,000 cycles for maximum capacity of STU, assuming the worst case that the 'Lock Up Load' i

Determine the analysis of presress, Analysis of presress  In pre-stress...

Analysis of presress  In pre-stressed structural elements, stretched tendons are placed inside concrete. The tensile stresses of the tendons are transferred to concrete in the

Void ratio, why void ratio is greater for fine gained soil then course grai...

why void ratio is greater for fine gained soil then course grained soil.

Wet mix Macadam, Test required before laying or after laying.

Test required before laying or after laying.

Large catchments in estimating peak runoff, Question Is it true that ra...

Question Is it true that rational process has to not be used for large catchments in estimating peak runoff ? Answer Rational process is appropriate for small catchme

Explain the wetted perimeter, Explain the Wetted Perimeter (P) The line...

Explain the Wetted Perimeter (P) The linear length of the interface between the fluid's cross-sectional plane edges in contact with the pipe or channel wall.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd