Wall method of estimation, Civil Engineering

Assignment Help:

1. Can you enumerate the benefits of individual wall method of estimation?

2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method?

3. Which method you will choose - center line method or individual wall method for estimation of buildings?

4. Write the parameters you should keep in mind while estimating the RCC structures?

5. A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.


Related Discussions:- Wall method of estimation

Explain the unconfined compression strength of the clay, A square group of ...

A square group of 9 piles was driven into soft clay extending to a large depth. The diameter and length of the piles were 30 cm and 9 m respectively. If the unconfined compression

Explain basic need of design of shock transmission unit, Explain the Basic ...

Explain the Basic requirement of Design of shock transmission unit? The STU must withstand the specified design load. The stroke of the piston must be bigger than the movement

Drainage of embankment slopes, Drainage of Embankment Slopes: Slopes ...

Drainage of Embankment Slopes: Slopes of high embankments get eroded by rain water. Deep rain cuts are formed, which endanger the pavement. In such cases, it is customary to

Joints in concrete carriageway, Question Is it necessary joints of conc...

Question Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway ? Answer In regular practice, joints are provided in road kerbs to ca

Calculate the final volume of the compacted soil, 1. 130,000-yd 3 of banke...

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted

Traffic surveys, Traffic Surveys: The following traffic surveys are n...

Traffic Surveys: The following traffic surveys are needed for preparing a good road project: Classified Volume Counts This survey is normally carried out for 7 days,

What is the meaning of compressive stresses, What is the meaning of compres...

What is the meaning of compressive stresses These intentionally induced stresses are compressive in nature and these compressive stresses reduce or completely remove the undesi

Surveying, How to read verniers and main scale readings on theodolite of 10...

How to read verniers and main scale readings on theodolite of 10"?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd