1. Can you enumerate the benefits of individual wall method of estimation?
2. Estimate the single room of size 3m x 4m x height 3m using individual wall method?
3. Which method you will choose - center line method or individual wall method for estimation of buildings?
4. Write the parameters you should keep in mind while estimating the RCC structures?
5. A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?
6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.
Q. Explain Remote sensing technique? Remote sensing is a science or an art of obtaining the information about an object, area or a phenomenon through analysis of data acquired
Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greate
Explain briefly shallow foundation?
Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on
differences between highway pavement and airfield pavement
what is reciprocal method?
How does the knife edge load simulate the existing condition of the bridge structure?
Pls provide matlab design for transportation engg.
the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangl
Project specifications require a relative compaction of 95% (modified Proctor). Construction of a highway embankment requires 10,000-yd 3 of fill. The borrow soil has an in-situ
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd