1. Can you enumerate the benefits of individual wall method of estimation?
2. Estimate the single room of size 3m x 4m x height 3m using individual wall method?
3. Which method you will choose - center line method or individual wall method for estimation of buildings?
4. Write the parameters you should keep in mind while estimating the RCC structures?
5. A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?
6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.
Explain the Hydraulic Radius (R) A fluid's cross-sectional area in flow divided by the wetted perimeter. For a circular channel flowing full and ½ full, R = D/4.
Q. Corrosion protection of lifting anchors in precast concrete? Corrosion of lifting anchors in precast concrete units has to be prevented since the corroded lifting units caus
Are diaphragms necessary in designing of concrete box girder bridges ?
equilibrium free body digram
Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo
Evaluate break even point: A vehicle manufacturing firm purchase axle from a shaft manufacturing industry at Rs.100 each. If it establishes the essential apparatus for the pro
procedure for designing of sewage scheme
Debonding
Define Installation of Pot Bearings? In a sliding POT bearing, positive fixing to the main structure may not be required if the bearing is always subjected to adequate vertical
Describe the various steps in embankment construction.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd