Wall method of estimation, Civil Engineering

Assignment Help:

1. Can you enumerate the benefits of individual wall method of estimation?

2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method?

3. Which method you will choose - center line method or individual wall method for estimation of buildings?

4. Write the parameters you should keep in mind while estimating the RCC structures?

5. A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.


Related Discussions:- Wall method of estimation

Relation of the angle of contact between pipe invert, Relation of the angle...

Relation of the angle of contact between pipe invert and bedding material to the load resisting capacity of pipe Minimum crushing strength is a generally adopted parameter for

Concrete technology, why strength of transition zone is less than bulk past...

why strength of transition zone is less than bulk paste

Strength of concrete at the transfer stage, Strength of Concrete at the Tra...

Strength of Concrete at the Transfer Stage Concrete strength in the member at the transfer stage should conform to the design requirements. The frequency of the sampling and t

Control reinforcement corrosion, Crack width limitation ( In many stand...

Crack width limitation ( In many standards and code of practice of numerous countries, allowable size of crack width is generally limited to less than 0.5mm for reinforced conc

Construct the correct network for project, A project requires that activiti...

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can

coursework (commercial management), Ask que1. Identify the risks involved ...

Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers. 2

Cross Section Method, Cut and Fill Calculation Using Cross Section Method

Cut and Fill Calculation Using Cross Section Method

Explain hot weather patrolling, Q. Explain Hot weather Patrolling ? Hot...

Q. Explain Hot weather Patrolling ? Hot weather Patrolling is done for LWR and CWR tracks when the rail temperature reaches td + 20 0 C and above and td + 14 0 C for Central

Explain cercla and sara - hazardous waste regulations, Explain CERCLA and S...

Explain CERCLA and SARA - Hazardous Waste Regulations In 1980, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) was enacted to address tho

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd