Wall method of estimation, Civil Engineering

Assignment Help:

1. Can you enumerate the benefits of individual wall method of estimation?

2. Estimate the single room of size 3m x 4m x height 3m  using individual wall method?

3. Which method you will choose - center line method or individual wall method for estimation of buildings?

4. Write the parameters you should keep in mind while estimating the RCC structures?

5. A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.


Related Discussions:- Wall method of estimation

Standard mixes of concrete, In some nations such as Britain, specification ...

In some nations such as Britain, specification for concrete doesn'tusually require cube tests for standard mixes of concrete. Quality control of standard mixes in Britain is achiev

What is the density index of the natural soil, A sand at a borrow pit is de...

A sand at a borrow pit is determined to have an  in-situ dry unit weight of 18.4 kN/m 3 . Laboratory tests indicate the maximum and  minimum unit weight values of 19.6 kN/m 3 and

Design of steel lug angles with channel sections.., while designing the lug...

while designing the lug angles with the channel section what does "the force not acccounted for by the direct connection of member" mean?

Modes of transport, Modes of Transport Various Modes of Transport ...

Modes of Transport Various Modes of Transport There are several modes of transport which can be developed by a country. In every country, the principal modes exist ar

Surveying, What is fore bearing and back bearing?how it measure?

What is fore bearing and back bearing?how it measure?

Harbour layout, Harbour Layout: A harbour has the following constitue...

Harbour Layout: A harbour has the following constituent parts: (a)        An entrance channel, 100-300 m wide (b)       A turning basin, dia 400-600 m (c)        A b

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Determine the expected extension at the jack, A cylindrical concrete tank,...

A cylindrical concrete tank, 30 m external diameter, is to be prestressed circumferentially by means of  high-strength steel wire (E, = 2 x  10 5   N/mm 2 )  jacked  at 4 points, 9

Torpedo splice triple wedges, Torpedo splice triple wedges In a Torpedo...

Torpedo splice triple wedges In a Torpedo splice triple wedges, shown in Figure, are provided to firmly hold tendon wires. Whole assembly of the splice is housed in a sleeve. L

Shallow bedrock condition adverse for open berth piers, Question What i...

Question What is the reason that shallow bedrock condition adverse for open berth piers? Answer Most severe load on piers generally is horizontal load due to berthing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd