Reasons of ground heaving during pipe-jacking, Civil Engineering

Assignment Help:

Reasons of ground heaving during pipe-jacking

It is commonly recognized that ground settlement is one of the significant concern in pipe jacking operation. Though engineer must also pay attention to the problem of ground heaving at the time of grouting work of pipe-jacking. For illustration, if excessive slurry or grout pressure is applied so as to exceed overburden pressure, ground heaving would result. Otherwise if the ground contains loose soils with high porosity, same phenomenon also takes place. Proper control on the applied pressure and viscosity of slurry/grout is essential to prevent such occurrence.


Related Discussions:- Reasons of ground heaving during pipe-jacking

Mathcad prime2.0, I want to ask about mathcad prime 2.0, when I want to sav...

I want to ask about mathcad prime 2.0, when I want to save my work it shows that I can''t save it because Excel is busy ,, what I have to do to fix this problem ??

List the factor that affect the permeability of a given soil, List the fact...

List the factors that affect the permeability of a given soil. Determine the precautions that should be taken so that satisfactory permeability data may be obtained. Explaining

Calculate the amount of concrete - construction management, An electrical c...

An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank

Frames, how to analyse a frame

how to analyse a frame

Calculate the flood discharg, Q. A bridge is to be constructed over a strea...

Q. A bridge is to be constructed over a stream having a catchment area = 20 miles 2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 88

Define the hazard ranking system (hrs), Define the Hazard Ranking system (H...

Define the Hazard Ranking system (HRS) - A procedure for ranking uncontrolled hazardous waste sites in terms of the potential threat based upon the containment of the route of

Levelling, principle of direct levelling

principle of direct levelling

Surveying, readings of longitudinal and cross section levelling

readings of longitudinal and cross section levelling

Mechanism of plastic settlement in fresh concrete, Q. Mechanism of plastic ...

Q. Mechanism of plastic settlement in fresh concrete? Within a few hours after placing of fresh concrete, plastic concrete can experience cracking due to occurrence of plastic

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd