This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expected to answer questions 1 and 2 to demonstrate his/her understanding of all the associated assessment criteria.

 You are a member of a design team in a consulting engineering company engaged by a developer. The developer requires preliminary designs for a complex in East Trinidad which aims at meeting the needs of the modern middle class family. The complex includes twelve (12) townhouses, a senior citizen retirement home and shopping centre with food court.

The townhouses are two (2) storey buildings, four (4) bedrooms, accommodate five (5) persons, master bathroom with bathtub, laundry and hot and cold water supply.

The senior citizen retirement home is central air condition two (2) storey building, provides accommodation for sixty (60) residents, fifteen (15) staff members, and a doctor's office with facilities to provide basic health care.

The shopping centre includes ten (10) stores and a food court with five (5) restaurant outlets.

Question 1

You are required to:

1. Produce a sketch plan showing the wastewater reticulation system for the complex.

2. Show how the foul water, rain water and surface water from the complex will be removed or reused on the complex.

3. Describe how the wastewater system for the complex will be tested and commissioned.

You are to ensure that all the requirements of the clients and buildings are met and that the designs comply with local regulatory standards for wastewater supply and solid and liquid waste disposal. You are to state all the assumptions made and provide a list of client and building requirements.

Question 2

You are required to:

a.  Describe what methods could be employed to dispose of the solid and liquid waste for the complex. 

b.  Utilise any latest technologies for recycling and recirculation of solid and liquid waste disposal on the complex.

c.  Provide simple sketch of pertinent/appropriate sections of the design depicting the system that will be utilized to achieve (a) and (b) above.


Related Discussions:- Plumbing technology

Builiding, how to bulid a bilding?

how to bulid a bilding?

Transportatoin engineening, explain the construction while aligning roads o...

explain the construction while aligning roads on hilly areas

Municipal Hydraulics, Hello I have an assignment due feb 1st at 3 pm. I wan...

Hello I have an assignment due feb 1st at 3 pm. I wanted to know if it was possible that it gets solved

#title.roads., metal sizes required and adopted question #Minimum 100 words...

metal sizes required and adopted question #Minimum 100 words accepted#

Direction of placing the main weight of reinforcement, Q. Direction of plac...

Q. Direction of placing the main weight of reinforcement in concrete pavement? The reinforcement of concrete pavement is typically in the form of longmesh type. A road generall

Soil compaction test, Question In soil compaction test , if test resul...

Question In soil compaction test , if test result exceeds 100%, should engineers accept result? Answer Soil compaction is method of increasing soil density by re

Wastewater, Why is there a concern for dissolved organics and color in the ...

Why is there a concern for dissolved organics and color in the water supply and in water treatment plant?

Explain the limitations of rebound hammer, Explain the Limitations of Rebou...

Explain the Limitations of Rebound Hammer? The following characteristics of concrete can affect the correlation of the rebound number with the actual surface hardness and shoul

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd