Plumbing technology, Civil Engineering

Assignment Help:

 

This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expected to answer questions 1 and 2 to demonstrate his/her understanding of all the associated assessment criteria.

 You are a member of a design team in a consulting engineering company engaged by a developer. The developer requires preliminary designs for a complex in East Trinidad which aims at meeting the needs of the modern middle class family. The complex includes twelve (12) townhouses, a senior citizen retirement home and shopping centre with food court.

The townhouses are two (2) storey buildings, four (4) bedrooms, accommodate five (5) persons, master bathroom with bathtub, laundry and hot and cold water supply.

The senior citizen retirement home is central air condition two (2) storey building, provides accommodation for sixty (60) residents, fifteen (15) staff members, and a doctor's office with facilities to provide basic health care.

The shopping centre includes ten (10) stores and a food court with five (5) restaurant outlets.

Question 1

You are required to:

1. Produce a sketch plan showing the wastewater reticulation system for the complex.

2. Show how the foul water, rain water and surface water from the complex will be removed or reused on the complex.

3. Describe how the wastewater system for the complex will be tested and commissioned.

You are to ensure that all the requirements of the clients and buildings are met and that the designs comply with local regulatory standards for wastewater supply and solid and liquid waste disposal. You are to state all the assumptions made and provide a list of client and building requirements.

Question 2

You are required to:

a.  Describe what methods could be employed to dispose of the solid and liquid waste for the complex. 

b.  Utilise any latest technologies for recycling and recirculation of solid and liquid waste disposal on the complex.

c.  Provide simple sketch of pertinent/appropriate sections of the design depicting the system that will be utilized to achieve (a) and (b) above.


Related Discussions:- Plumbing technology

RISE AND FALL METHOD, WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD...

WHAT IS THE PURPOSE OF USING THE RISE AND FALL METHOD IN LEVELLING?

Determine about the hard-drawn steel wires, Determine about the Hard-drawn ...

Determine about the Hard-drawn steel wires Hard-drawn steel wires which are indented or crimped are preferred for pre-tensioned members as their bond characteristics are superi

Transportation issues, "We have one other pressing challenge that you could...

"We have one other pressing challenge that you could review for us," Alistair Wu says. "As you know, the Shanghai plant was our first facility in China, but we also have two other

Describe the features of physical survey phase, Describe the features of ph...

Describe the features of physical survey phase The Physical Survey (field and laboratory test) for the purpose of determination of physical and engineering properties of the ma

Cement bag question., composition of cement in cover bag should be written ...

composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?

Design an equalization basin with a safety factor, A storm occurs with rain...

A storm occurs with rain of varying intensity falling over a commercial area. The area has a combined sewer system. Two interceptor sewers direct flow to the wastewater treatment p

Verify the magnification and transmitted force, The exciting force in a con...

The exciting force in a constant force type of excitation was 120 kN. The natural frequency of the machine foundation is 4 Hz. The damping factor is 0.36. Verify the magnificati

Build of a cmplete home, how can we build a complete home on an area of 500...

how can we build a complete home on an area of 500 meter squares with garden and house and a garage

Impact of possible energy, a) Take into consideration the boiler efficiency...

a) Take into consideration the boiler efficiency, and verify the cost of heating the building, during the heating season, using present oil and gas prices.  b) Investigate the i

California Bearing Ratio, What is the California bearing ratio for granular...

What is the California bearing ratio for granular A, Granular B, 19 mmm Crusher Run Limestone, 50 mm Crusher run limestone, HL3 and HL8 Asphalt?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd