This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expected to answer questions 1 and 2 to demonstrate his/her understanding of all the associated assessment criteria.

 You are a member of a design team in a consulting engineering company engaged by a developer. The developer requires preliminary designs for a complex in East Trinidad which aims at meeting the needs of the modern middle class family. The complex includes twelve (12) townhouses, a senior citizen retirement home and shopping centre with food court.

The townhouses are two (2) storey buildings, four (4) bedrooms, accommodate five (5) persons, master bathroom with bathtub, laundry and hot and cold water supply.

The senior citizen retirement home is central air condition two (2) storey building, provides accommodation for sixty (60) residents, fifteen (15) staff members, and a doctor's office with facilities to provide basic health care.

The shopping centre includes ten (10) stores and a food court with five (5) restaurant outlets.

Question 1

You are required to:

1. Produce a sketch plan showing the wastewater reticulation system for the complex.

2. Show how the foul water, rain water and surface water from the complex will be removed or reused on the complex.

3. Describe how the wastewater system for the complex will be tested and commissioned.

You are to ensure that all the requirements of the clients and buildings are met and that the designs comply with local regulatory standards for wastewater supply and solid and liquid waste disposal. You are to state all the assumptions made and provide a list of client and building requirements.

Question 2

You are required to:

a.  Describe what methods could be employed to dispose of the solid and liquid waste for the complex. 

b.  Utilise any latest technologies for recycling and recirculation of solid and liquid waste disposal on the complex.

c.  Provide simple sketch of pertinent/appropriate sections of the design depicting the system that will be utilized to achieve (a) and (b) above.


Related Discussions:- Plumbing technology

Manage civil work design, Ask question #Minimum 1Make a detailed list of al...

Ask question #Minimum 1Make a detailed list of all constraints and requirements to the bridge design00 words accepted#

Design a 10 unit rapid sand filter system, Design a 10 unit rapid sand filt...

Design a 10 unit rapid sand filter system for a flow of 6.3 MGD with a filtration rate of 2 gpm/sq ft. and an L: W ratio of 1.3.   Design flow (Q) = 6.3 MGD = 6.3x106 gpd =

Water absorption test - tests on stones, Water Absorption Test: In t...

Water Absorption Test: In this test cube specimen weighing approximate 50 grams are prepared and the test is carried out in the steps following: 1.    Note down the weigh

Method of observation by satellite, Q. Method of observation by satellite? ...

Q. Method of observation by satellite? The difference between a photographs and imageries needs to be understood first. A photograph covers a specific area within its view and

Energy dissipation at outlets - typical drainage outlet, Q. Energy dissipat...

Q. Energy dissipation at outlets - typical drainage outlet? Flow velocity at outlets is generally high. Without proper control of this energy, subsequent bank erosion can resu

Define the precedence diagramming methods, Define the Precedence Diagrammin...

Define the Precedence Diagramming Methods a) Activity on Node (AON) with arrows for dependencies b) Uses all forms of precedence relationships

Explain about vierendeel girder, Q. Explain about Vierendeel girder? Vi...

Q. Explain about Vierendeel girder? Vierendeel girder design is sometimes adopted in design of footbridges. Traditionally truss design, triangular shape of truss is generally u

What are the parasitic forces for prestressing, Q. What are the Parasitic f...

Q. What are the Parasitic forces for prestressing? In statically determinate structures, prestressing forces will cause the concrete structures to end upwards. Therefore precam

Weigh batching, measurement of gauge box for sand ?

measurement of gauge box for sand ?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd