Determine the preliminary settlement analysis, Civil Engineering

Assignment Help:

Preliminary settlement analysis for a building indicated a settlement of 50 mm in 4 years and an  ultimate  settlement  of  250 mm.  The average pressure increment in the clay stratum was 30 kN/m2.

If the following variations occurred in the assumptions, verify the revised value of ultimate settlement and the settlements at the end of the loading period and that at 3 years after the completion of the building.

(i) The loading period was 2 years, which was not considered in the preliminary analysis.

(ii) Borings shown 25% more thickness for the clay layer than originally assumed.

(iii) The water table got lowered permanently during construction by 1.5 metres.

 


Related Discussions:- Determine the preliminary settlement analysis

Calculate the amount of concrete - construction management, An electrical c...

An electrical contractor is preparing to place the duct bank concrete encasement for the high voltage feeders between manhole # 11 and # 12, total distance is 323-ft. The duct bank

Sieve analysis - soil mechanics and foundations, Sieve Analysis - Soil Mech...

Sieve Analysis - Soil Mechanics and Foundations a. Sieve Analysis used to obtain the grain size distribution of coarse-grained soils (sands and gravels) larger than 0.075 mm (r

Is cbr test is an arbitrary test, CBR Test is an arbitrary test', justify. ...

CBR Test is an arbitrary test', justify. Explain the procedure for conducting the CBR test in the field. Surcharge loads are used in the CBR test; Describe their significa

Structure analysis, In a cantilever truss it is very essential to find out ...

In a cantilever truss it is very essential to find out the reactions before analyzing it.

Designing water storage tank, Question While designing water storage t...

Question While designing water storage tank , has movement joints be installed? Answer While designing water storage tanks , group joints can be set up in similar w

Define lap length of reinforcement, Q. Define lap length of reinforcement? ...

Q. Define lap length of reinforcement? In some structural codes, lap length of reinforcement is simplified to be a certain percentage (e.g. 25%) higher than anchorage length. T

Define types of inspection of bridge, Define Types of Inspection of Bridge?...

Define Types of Inspection of Bridge? Underwater inspections are generally categorised into five types: - Inventory - Routine - Damage - In-depth - Interim

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd