Question
What is main principle of post-grouting for mini-piles?
Answer
During course of post-grouting, a tube with a hole at its base is lowered into pile and grout is injected. Device of post-grouting is as follows- pressurized grout is at first confined by hardened grout and is able to hardly get away. Then, it ruptures grout cover and makes its way to surrounding soils and into soft regions to expand an interlock with harder soil zones. In order to improve pressurized grout to rupture initial grout depth, an utmost time limit is usually imposed between time of initial grouting and time of post-grouting to keep away from development of high strength of initial grout. So, effect of soil disturbance by putting in of casings and subsequent lifting up of casings will be lessened appreciably.
Where we can provided overlap in columns
slabs and beam formwork
Explain the Bernoulli Energy Equation Accounts for the fluid energy at any point in a fluid flow system. Units are in ft. Developed for energy without friction. The total energ
Q. What is Assisted Siding? An Assisted Siding is a siding to serve a factory, mill or other industrial premises other than colliery or mining are because such siding is antici
Question What is key mechanism of defence by hot dip galvanizing ? Answer Hot dip galvanizing protects steel or iron from corrosion by- (i) It figures a metallic z
Categories of losses of prestress We may put various losses in either of two categories : Losses which take place during transfer of prestress and those which take place after
The water table is lowered from a depth of 3 m to a depth of 6 m in a deposit of silt. The silt remains saturated even after the water table is lowered. What would be the enhance i
An unconfined aquifer is called to be 32 m thick below the water table. A constant discharge of 2 cubic metres per minute is pumped out of the aquifer by a tubewell till the water
what is shear stress
Explain the Methods of Underwater Inspection? There are three common methods of carrying out underwater inspection of bridge elements. a) Wading inspection b) Scuba div
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd