Indicate quality of rock foundation, Civil Engineering

Assignment Help:

Question

During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by such condition?


Answer


Use of total core recovery to determine founding level might not be able to indicate quality of rock foundation for piles as it depends on drilling practice and drilling equipment (GEO (1996)). For case, if standard core barrels are used to gather samples, it could indicate sufficient core healing for sample full of rock joints and weathered rock. On other hand, if triple tube barrels are used for obtaining soil samples, sample with joints and weathered rock is able to also achieve needs of total core recovery.

 


Related Discussions:- Indicate quality of rock foundation

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Structural engg, how static and dynamic frames are works?

how static and dynamic frames are works?

Tension member, Explain various forms of tension members.

Explain various forms of tension members.

Spun pipes, what is flush joint and confined joint in rcc spun pipes?

what is flush joint and confined joint in rcc spun pipes?

Bearings, what is the difference between whole circle bearing and reduced b...

what is the difference between whole circle bearing and reduced bearing?

Explain the term - uniaxial - biaxial -triaxial prestressing, Explain the t...

Explain the term - Uniaxial - Biaxial -Triaxial Prestressing These terms refer to cases when the concrete is prestressed in only one direction, in two mutually perpendicular di

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

Reason in checking the ratio, Reason in checking the ratio (i.e. design flo...

Reason in checking the ratio (i.e. design flow to full-bore flow > 0.5) in circular pipe design For checking of self-cleansing velocity for pipes, there is another criterion t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd