Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Explain the Inventory inspections - Inspection of Bridge?
These inspections are normally performed following new construction, modifications, or repair to establish as-built or base line structural conditions and collect structural inventory and appraisal data. Inventory inspections are often referred to as “baseline inspections” since they generally become the benchmark for assessing the results of all future inspections. Inventory inspections identify potential structural problems; such as if the facility is scour critical. Aided by a prior detailed review of plans, it is during this inspection that any underwater members are noted for subsequent focus and special attention.
Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e
The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o
Common defects - bituminous roads: Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt. If an overlay is to be laid on a cracke
#How to find the sieve analysis of 20mm aggregate?
by estimation
what you mean by civil engineering
Define Seismic Isolation Bearings - Bridge Bearing? Many bridges had been built before the proper seismic design specifications were known to us. These bridges require strengt
An 8 kN.m moment is applied at the end of a block fixed into the ground as illustrated in thefigure below. The moment vector (double arrow head representation) acts in line with th
Question Is it true that there is no essential to design nominal reinforcement to piles. Answer In BS8110 and BS5400 Pt.4, they need provision of nominal reinforce
how to fill traverse computation sheet of opened traversig ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd