Addition of water to bored piles
In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of excavation below casings by pumping water to pile bore. This balanced head condition is created to minimize possible drawdown of surrounding water table that can affect the stability of nearby structures. Furthermore this helps to limit the possible inflow of water by piping from base of pile bore.
The following test results were obtained for a 100 ml wastewater sample taken at the inlet to wastewater treatment plant. The tests were performed using the standard methods. Dete
cross section diagram of urban roan in embankment,in cut,in eight lane,in conjusted area,divided hihgway
Define Alum (aluminum sulfate) Caogulation Purchased as dry or liquid alum { Al 2 (SO 4 ) 3 ,14 H 2 O}, MW 594 (other formulas with varying number of water molecules also u
An elastomer is a polymeric substance obtained after vulcanization of rubber. Vulcanization is the process of improving the properties of rubber by heating with sulphur. A normal r
What is the meaning of Wrapped splices In the Wrapped splices, tendon wires are wrapped with small diameter high-tension wires along their lengths with the help of wire windin
Explain some Important Points for Hazardous Waste The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous w
Q. Principle of airlifting for cleaning pile bores? Airlifting is generally carried out before concreting to remove debris and clean the base of pile bores. It basically acts a
Solve the following three questions of the beam ABCD. Note that A is a fixed end; B is apin connection; C is a roller support; and D is a free end. 1) Sketch the quantitative
For the project work points (x,y) shown in the figure the bearing of point R is due West. The coordinate for point R is most nearly: Solution: Determine the length o
how to convert UVL to UDL
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd