Calculate the volume of excavation, Civil Engineering

Assignment Help:

Calculate the Volume of Excavation

Using the information given in Figure, the volume of excavation in yd3 is most nearly:

 

287_Calculate the Volume of Excavation.png

Solution: Use the average end area method:

Volume (yd3) = [(A1 + A2) ÷ (2)] x [(L ÷ 27)]

Volume (yd3) = [725 + 544) ÷ (2)] x [(100 ÷ 27)]

Volume (yd3) = 2,350-yd3


Related Discussions:- Calculate the volume of excavation

Calculate the amount of import or export, Calculate the Amount of Import or...

Calculate the Amount of Import or Export For the project site shown in Figure, the amount of import or export to bring the entire site to elevation 90-ft is most nearly:

Pavement width - geometric design of roads, Pavement Width: The pavem...

Pavement Width: The pavement widths commonly adopted are : Single lane                 :           3.75 m Intermediate lane     :           5.5 m Two lane

Dam details, how to prepare a project of final year

how to prepare a project of final year

Fixed end moments, For fixed beam(say for example fixed with a point load a...

For fixed beam(say for example fixed with a point load at midspan) how did we end up getting P*L/8...??

Determine the grade rod reading at station, A section view of a proposed ro...

A section view of a proposed roadway is shown in Figure 1 with an existing grade point elevation of 100-ft. The proposed roadbed finish grade elevation at station 50+00 is 95.00-ft

Major compensation of using hdpe as compared with cast iron, Question N...

Question Now, mainly flap valves are ended of HDPE. What is the major compensation of using HDPE as compared with cast iron? Answer (i) It has no response with sewage a

Example of bars of varying cross section, Example of Bars of Varying Cross ...

Example of Bars of Varying Cross Section: In the numerical example under consideration δ = 750 × 300/( π/4) × 200 2 × 60 +750 × 400/(π/4) × 135 2 × 60 + 750 × 200/(π/4)

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd