Define limitations of radiography - inspection of bridge, Civil Engineering

Assignment Help:

Define Limitations of Radiography - Underwater Inspection of Bridge?

i. Radiography is a costly and time consuming method, which re- quires extensive safety measures to be adopted at site.

ii. Radiography may miss cracks, which are not parallel to the radiation beam or are in thick sections.

Computerised Tomography (CT), which is again based on radiography, is a recent and more advanced method. With this, voids can be located, steel locations can be pinpointed and sections can be indicated accurately.

 


Related Discussions:- Define limitations of radiography - inspection of bridge

Surveying, Use of optical square in chain surveying?

Use of optical square in chain surveying?

Systems approach to diagnose and solve the chronic w, systems approach to d...

systems approach to diagnose and solve the chronic water crisis in the city.

Construction measurment, calculating quantity of excavation, formwork, conc...

calculating quantity of excavation, formwork, concrete

What is bonded post-tensioning, What is Bonded Post-tensioning In post...

What is Bonded Post-tensioning In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism

What is stress corrosion, What is Stress Corrosion Stress corrosion ta...

What is Stress Corrosion Stress corrosion takes place in prestressed concrete tendons due to the combined actions of corrosion and static tensile stresses. This type of attack

Determine the major role of construction, Determine the major role of const...

Determine the major role of construction A major part of civil engineering construction involves the use of cement concrete. Concrete has a good compressive strength and works

Shear force, what is shear failure and shear force please explian?

what is shear failure and shear force please explian?

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd