What is bonded post-tensioning, Civil Engineering

Assignment Help:

What is Bonded Post-tensioning

In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism of transfer of prestress may still be trhough the anchorages, grouting of ducts may provide environmental protection to tendons against corrosion. 


Related Discussions:- What is bonded post-tensioning

What is codal provisions, According to National Building Code (Sp:7 1970), ...

According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist

Ceramic tiles for construction material, Q. Ceramic Tiles for construction ...

Q. Ceramic Tiles for construction material? For public toilet bath rooms , kitchen etc to ensure cleanliness floors should be provided with ceramic tile. For water points on

Two pegs test, the distance between two pegs M and N is 7,063 as measured o...

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

Define analytical methods approved under the clean water act, Define Analyt...

Define Analytical Methods Approved Under the Clean Water Act? Analytical Methods Approved Under the Clean Water Act CWA Section 304(h) needs EPA to publish test procedures (ana

WATER RESOURCES SYSTEM PLANNING AND MANAGEMENT, Two crops are grown on land...

Two crops are grown on land of 20ha.The cost of raising crop 1 is 3unit/ha, while for crop 2 it is 1 unit/ha.The benefit from crop 1 is 5unit/ha and from crop 2, it is 2 unit/ha. A

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Calculate benefit cost ratio for government project, Calculate the Benefit-...

Calculate the Benefit-Cost Ratio for Municipal Government Project With interest at 10%, the benefit-cost ratio for this municipal government project is most nearly:   Initia

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd