What is bonded post-tensioning, Civil Engineering

Assignment Help:

What is Bonded Post-tensioning

In post-tensioned construction, ducts, in which tendons are provided, are sometimes grouted after the stressing operation. Though the mechanism of transfer of prestress may still be trhough the anchorages, grouting of ducts may provide environmental protection to tendons against corrosion. 


Related Discussions:- What is bonded post-tensioning

Mohrs circle, The state of stress at a point is given through the stress co...

The state of stress at a point is given through the stress components sx = 70 MPa, sy = 10 MPa, and txy = - 40 MPa. Using Mohr''s circle find (i) Principal stresses, and (ii) Princ

What is the meaning of untensioned reinforcement, Supplementary or Untensi...

Supplementary or Untensioned Reinforcement It is that reinforcement, provided in prestressed concrete member, which is not provided in a stretched condition like tendons.

Doors, rolling steel door

rolling steel door

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Maintenance of airport pavements, Maintenance of Airport Pavements: ...

Maintenance of Airport Pavements: Maintenance Elements The maintenance of airport pavements is an important task of a civil engineer, since the safe movement of aircr

Designing of pipe jacking, Question While designing of pipe jacking , ...

Question While designing of pipe jacking , what particular areas on pipe joints have to engineers make sure of? Answer While in pipe jacking, jacked pipes may well ha

Levelling, how to go about the collimation method.

how to go about the collimation method.

Bituminous Macadam, What is the difference between Dense bituminous Macadam...

What is the difference between Dense bituminous Macadam and bituminous macadam

Measurements, Explain the concept of average velocity

Explain the concept of average velocity

Design a 10 unit rapid sand filter system, Design a 10 unit rapid sand filt...

Design a 10 unit rapid sand filter system for a flow of 6.3 MGD with a filtration rate of 2 gpm/sq ft. and an L: W ratio of 1.3.   Design flow (Q) = 6.3 MGD = 6.3x106 gpd =

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd