Q. Function of waterproof (or separation) membrane for concrete carriageway

A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab for the below reasons:

(i)  It prevents loss of water from cement paste that affects the strength of concrete slab.

(ii) It improves the movement of concrete slab relative to sub-base layer and decrease the frictional forces developed at their interface.

(iii)It avoids the possibility of active aggressive agents from soil water being attached to concrete slab.

(iv) It prevents intermixing of freshly placed concrete with loose materials on the surface of sub-base.

347_Function of waterproof membrane for concrete carriageway.png

Fig: Location of separation membrane in concrete carriageway


Related Discussions:- Function of waterproof membrane for concrete carriageway

Explain the primary treatment for wastewater, Explain the Primary Treatment...

Explain the Primary Treatment for Wastewater Primary Treatment: to remove the pollutants that floats or settles. Typically 60% of suspended solids and 35% of BOD 5 are removed

How double drainage occur, The loading period for a building extended from ...

The loading period for a building extended from Feb., 1957 to Feb., 1959. In Feb., 1962, the average measured settlement was found to be 117 mm. The ultimate settlement was expecte

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Doors, rolling steel door

rolling steel door

State about the pre-tensioned concrete beam, State about the pre-tensioned ...

State about the pre-tensioned concrete beam A pre-tensioned concrete beam, 200 mm wide and 300 mm deep, is prestressed by straight wires carrying an initial force of 150 kN at

What is the absolute maximum shear stress, A strip load of considerable len...

A strip load of considerable length and 1.5 m width transmits a pressure of 150 kN/m 2 to the underlying soil. Verify the maximum principal stress at 0.75 m depth below the footin

Process to calculate the initial tension, Process to calculate the Initial ...

Process to calculate the Initial Tension The maximum stress induced in the prestressing tendon at the time of the stressing operation is known as initial tension in tendons. T

Flooring, construction detail of all types of flooring

construction detail of all types of flooring

Basic keywords related to road materials, Basic Keywords related to road ma...

Basic Keywords related to road materials: Sub-grade     :            The portion of road embankment immediately below the pavement. Soil Classifications :            A sy

Scheme of some smaller piles with same load capacity, Question Which wi...

Question Which will be a better choice, a large diameter piles or a scheme of some smaller piles with same load capacity ? Answer Choice of a large diameter pile suff

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd