Function of waterproof membrane for concrete carriageway, Civil Engineering

Assignment Help:

Q. Function of waterproof (or separation) membrane for concrete carriageway

A layer of waterproof (or separation) membrane is usually placed between sub-base and concrete slab for the below reasons:

(i)  It prevents loss of water from cement paste that affects the strength of concrete slab.

(ii) It improves the movement of concrete slab relative to sub-base layer and decrease the frictional forces developed at their interface.

(iii)It avoids the possibility of active aggressive agents from soil water being attached to concrete slab.

(iv) It prevents intermixing of freshly placed concrete with loose materials on the surface of sub-base.

347_Function of waterproof membrane for concrete carriageway.png

Fig: Location of separation membrane in concrete carriageway


Related Discussions:- Function of waterproof membrane for concrete carriageway

ceramics is what type of materials, Ceramics is what type of materials ? ...

Ceramics is what type of materials ? Answer: It is  an insulators.

Kerb overflow weirs – horizontal bars vs. vertical bars, Q. Kerb overflow w...

Q. Kerb overflow weirs – horizontal bars vs. vertical bars? Overflow weirs must be provided for steep roads (longitudinal gradient>5%), flat roads (longitudinal gradient Ess

Compute the negative skin friction of the pile group, A square pile group o...

A square pile group of 9 piles passes by a recently filled up material of 4.5 m depth. The diameter of the pile is 30 cm and pile spacing is 90 cm centre to centre. If the unconfin

Explain the statements about the critical path method, 1. Determine a netwo...

1. Determine a network diagram method that uses only finish-to-start relationships and may use dummy activities to define logical relationships.  2.  Precedence diagr

Flow diagram of wet process, what type of basin in which is stored and wha...

what type of basin in which is stored and what is silos what is channel and correcting basins what type of clinker is formed

Mechanics problem, i am facing some problem in solving the problem of elong...

i am facing some problem in solving the problem of elongation due to self weight suspended from fixed support in the conical bar

Role of each mode of transport, Role of Each Mode of Transport: Each ...

Role of Each Mode of Transport: Each mode of transport has its own role to play in a country. The role of each is as under: Roads : Road transport carries 80 per cent of

Vertical curves - geometric design of roads, Vertical Curves: When tw...

Vertical Curves: When two vertical gradients meet, it is necessary to provide a vertical curve. Two types of vertical curves are used: (a) Summit curve, where the point of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd