Uncompacted bedding for concrete pipes, Civil Engineering

Assignment Help:

Uncompacted bedding for concrete pipes

In the middle third of the base of precast concrete pipes, bedding layers are suggested to be left Uncompacted since it helps to decrease the reaction force at the invert of the pipes and intensifies the effect of shear forces. Furthermore bending moment at pipe invert is increased by compaction of bedding layer. General rule for this region of bedding layer is that it must be firm enough for the pipes to rest on. 

Sides of haunch and bedding directly under the haunch must be compacted since this will decrease the bending moment at the invert that is the critical failure location for pipes. The compacted haunch helps to resist the pipe load and sustain level and alignment.


Related Discussions:- Uncompacted bedding for concrete pipes

Strength of concrete at the transfer stage, Strength of Concrete at the Tra...

Strength of Concrete at the Transfer Stage Concrete strength in the member at the transfer stage should conform to the design requirements. The frequency of the sampling and t

Preparation for underwater inspection - tool and equipment, Preparation for...

Preparation for Underwater Inspection - Availability of Tools and Equipment The engineer-in-charge, before taking up the inspection, should list out the complete equipment req

Derive, Derived condition of economic span of bridge

Derived condition of economic span of bridge

Which type of pile cap transfers loads equally to piles, Q. Which type of p...

Q. Which type of pile cap transfers loads equally to piles, flexible pile cap orrigid pile cap? Loads from columns transferring to pile cap persuade tensile forces at the bott

Explain foundation design discharge for a bridge, Q. Explain Foundation des...

Q. Explain Foundation design discharge for a bridge? To provide for an adequate margin of safety against any abnormal flood exceeding the design discharge (Q), the foundations,

Human values, give the two aspects of honesty& explain

give the two aspects of honesty& explain

Designing of access ramps for drainage channels, Question Designing of ...

Question Designing of access ramps for drainage channels, why must direction of access ramps is sloping down on the way to downstream ? Answer In designing of access

Gas welding be erected in upright position, Question Explain some reaso...

Question Explain some reasons why should acetylene gas cylinders used for gas welding be erected in upright position? Answer Acetylene gas is usually used for gas wel

Calculate the amount of waste, Calculate the Amount of Waste A municipa...

Calculate the Amount of Waste A municipal solid waste department plans to separate a portion of the ferrous metal, newsprint and cardboard from its MSW waste stream. The depart

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd