In the middle third of the base of precast concrete pipes, bedding layers are suggested to be left Uncompacted since it helps to decrease the reaction force at the invert of the pipes and intensifies the effect of shear forces. Furthermore bending moment at pipe invert is increased by compaction of bedding layer. General rule for this region of bedding layer is that it must be firm enough for the pipes to rest on. 

Sides of haunch and bedding directly under the haunch must be compacted since this will decrease the bending moment at the invert that is the critical failure location for pipes. The compacted haunch helps to resist the pipe load and sustain level and alignment.


Related Discussions:- Uncompacted bedding for concrete pipes

Fore bearing and back bearing, write a c program to calculate the included ...

write a c program to calculate the included angles for given fore bearing and back bearing.

Moment distribution method hinges, Analyse the continuous beam using moment...

Analyse the continuous beam using moment distribution. A continuous beam ABCDE fixed at A carry a load of 2KN one metre from A at AB 3m. BC 3m, carry a UDL of 3KN/m and hinge at

Hydraulics and Hydrology , A flow rate of 200 gpm of oil with u=1.5 x 10-3 ...

A flow rate of 200 gpm of oil with u=1.5 x 10-3 lb-sec/ft2 and p=1.7 slug/ft3 occurs in a 4-in pipe. Determine the Reynolds number. Classify the flow as laminar or turbulent. What

Diving operation - preparation for underwater inspection, Define Diving Ope...

Define Diving Operation - Preparation for underwater inspection? Use of experienced divers trained and screened by a reputed commercial diving school is critical for successful

Wmm, what is material of wmm plant

what is material of wmm plant

Find the size of the foundation required, A steam turbine with base 6 m × 3...

A steam turbine with base 6 m × 3.6 m weighs 10,000 kN. It is to be placed on a clay soil with c = 135 kN/m 2 . Find the size of the foundation needed if the factor of safety is to

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Fathometer, define Fathometer in civil engineering field #Minimum 100 words...

define Fathometer in civil engineering field #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd