Uncompacted bedding for concrete pipes, Civil Engineering

Assignment Help:

Uncompacted bedding for concrete pipes

In the middle third of the base of precast concrete pipes, bedding layers are suggested to be left Uncompacted since it helps to decrease the reaction force at the invert of the pipes and intensifies the effect of shear forces. Furthermore bending moment at pipe invert is increased by compaction of bedding layer. General rule for this region of bedding layer is that it must be firm enough for the pipes to rest on. 

Sides of haunch and bedding directly under the haunch must be compacted since this will decrease the bending moment at the invert that is the critical failure location for pipes. The compacted haunch helps to resist the pipe load and sustain level and alignment.


Related Discussions:- Uncompacted bedding for concrete pipes

Highway Materials, How to identify bitumen & tar just looking at those two ...

How to identify bitumen & tar just looking at those two binders.

Determine the types of losses of prestress, Determine the types of losses o...

Determine the types of losses of prestress A loss of prestress will affect the stress distribution on a section of the member. It is therefore necessary to estimate the probabl

Cross Section Method, Cut and Fill Calculation Using Cross Section Method

Cut and Fill Calculation Using Cross Section Method

Explain about viscous flow loss, Q. Explain about Viscous flow loss? Ab...

Q. Explain about Viscous flow loss? Absorptive material comprises interconnected voids and pores into which sound energy will propagate. When sound waves pass throughthe materi

What is gravity flow, Gravity flow is fluid flowing because of the forces o...

Gravity flow is fluid flowing because of the forces of gravity alone and not to an applied pressure head. In the Bernoulli equation, the pressure term is omitted, and the height an

Major functions of features observed in a typical manhole, Question Wha...

Question What are the major functions of following features observed in a typical manhole ? Answer (i) Groove near benching, (ii) R.S.J. (iii) double seal manhole cove

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Mixture of phases, Phases are usually identifiable because of adifference i...

Phases are usually identifiable because of adifference in density which causes gravitational separation. e.g. Ice floats on water, steam rises.

HIGHWAY CONSTRUCTION & MAINTENANCE, what is the difference between feasibil...

what is the difference between feasibility study and traffic counting

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd