Uncompacted bedding for concrete pipes, Civil Engineering

Assignment Help:

Uncompacted bedding for concrete pipes

In the middle third of the base of precast concrete pipes, bedding layers are suggested to be left Uncompacted since it helps to decrease the reaction force at the invert of the pipes and intensifies the effect of shear forces. Furthermore bending moment at pipe invert is increased by compaction of bedding layer. General rule for this region of bedding layer is that it must be firm enough for the pipes to rest on. 

Sides of haunch and bedding directly under the haunch must be compacted since this will decrease the bending moment at the invert that is the critical failure location for pipes. The compacted haunch helps to resist the pipe load and sustain level and alignment.


Related Discussions:- Uncompacted bedding for concrete pipes

Environment engineering assignment, Estimate the ground level NO concentrat...

Estimate the ground level NO concentration: a. Directly downwind at a distance of 2 km b. At the point downwind where NO is maximum c. At a point located 2 km downwind and 0.1 km

Disparity between working stress and limit state approach, Question Wha...

Question What is key disparity between working stress approach and limit state approach ? Answer Working stress approach, service loads are used in whole plan and st

Quantity calculation for subgrade preparation, reparation of subgrade in sq...

reparation of subgrade in sqm for a road of span 12 km and width 5.25m,with shoulders of 0.75m span on both the sides...considering extrawidening too......plz help...i m preparing

Transportation Engineering, can u help with assignment and how much per ass...

can u help with assignment and how much per assignment

Piers and piles, what is the difference between piers and piles?

what is the difference between piers and piles?

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

Is codes for building design, IS CODES FOR BUILDING DESIGN The codes w...

IS CODES FOR BUILDING DESIGN The codes which help engineers to design buildings are following: 1. IS 456-2000. For the design of plain and reinforced concrete it is code

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd