In the middle third of the base of precast concrete pipes, bedding layers are suggested to be left Uncompacted since it helps to decrease the reaction force at the invert of the pipes and intensifies the effect of shear forces. Furthermore bending moment at pipe invert is increased by compaction of bedding layer. General rule for this region of bedding layer is that it must be firm enough for the pipes to rest on. 

Sides of haunch and bedding directly under the haunch must be compacted since this will decrease the bending moment at the invert that is the critical failure location for pipes. The compacted haunch helps to resist the pipe load and sustain level and alignment.


Related Discussions:- Uncompacted bedding for concrete pipes

Determine the uses of prestressed concrete poles, Determine the uses of Pre...

Determine the uses of Prestressed concrete poles Prestressed concrete poles are commonly mass produced and are used in most countries for power transmission, antenna masts etc

Find out load carrying capacity, Q.for ISMB200 having 6.70 m span simply su...

Q.for ISMB200 having 6.70 m span simply supported so find out load carrying capacity.

Define influence lines, Define Influence lines Provides information...

Define Influence lines Provides information at a single point on a beam Can be used for: - Reactions - Internal shear forces - Internal moment Indicate

Discontinuity of joint – position of bearing, Q. Discontinuity of joint – p...

Q. Discontinuity of joint – position of bearing? Expansion joints in a bridge structures cater for movements inlongitudinal, transverse, vertical and rotational forms. Layout a

Energy equation, find the pressure head at 2-2 if the rate of flow in pipe ...

find the pressure head at 2-2 if the rate of flow in pipe is 0.36m^3/s

Determine the water content of the sand sample, In order to determine the w...

In order to determine the water content of a wet sand, a sample weighing 4 N was put in a pyknometer. Water  was then poured to fill it and the weight of the pyknometer and its con

Advantages and dis advantages of timber, WHAT ARE THE ADVANTAGES AND DISADV...

WHAT ARE THE ADVANTAGES AND DISADVANTAGES OF TIMBER FOR CIVIL ENGINEERING

Railway drawings, section of railway tracks in india ,all dimensions in met...

section of railway tracks in india ,all dimensions in meters

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd