Explain equation for change interval, Civil Engineering

Assignment Help:

Explain equation for Change Interval

y = t + v / 2a + 64.4G

Where:  y = length of yellow interval (sec)

    t = driver perception/reaction time (1.0 sec generally used)

    v = velocity of approaching vehicle (fps)

    a = deceleration rate (10 fps2 generally used) 

    G = grade of approach (percent/100)   

                         If G is positive percent or upgrade, use '+' symbol 

                         If G is negative percent or downhill, use '-' symbol


Related Discussions:- Explain equation for change interval

Bearing, convert the following whole circle bearing to QBs... WCB of AB=45 ...

convert the following whole circle bearing to QBs... WCB of AB=45 degree and 30 mintus

Calculate the cubic volume of crushed stone, Calculate the Cubic Volume of ...

Calculate the Cubic Volume of Crushed Stone A symmetrical running track is being constructed in the configuration and dimensions as shown.  The cubic volume (CY) of crushed st

Precast concrete jacking pipes, Question While precast concrete jackin...

Question While precast concrete jacking pipes , from time to time grout holes are calculated inside these precast pipes. Give specific and key reasons? Answer Grout h

Rb slab, #questionshow me picture..

#questionshow me picture..

Define compression - actions in pot bearings, Define Compression - Actions ...

Define Compression - Actions in POT Bearings? Vertical load is carried through the piston of the bearing and it is resisted by the elastomeric pad. Elastomer is incompressible,

Foundation, Explain briefly shallow foundation?

Explain briefly shallow foundation?

Explain energy grade line (egl), Explain Energy Grade Line (EGL) Graph ...

Explain Energy Grade Line (EGL) Graph of the sum of the potential, pressure and kinetic energies along a pipe or open channel. Energies are plotted along the y-axis above a dat

Maintenance of airport pavements, Maintenance of Airport Pavements: ...

Maintenance of Airport Pavements: Maintenance Elements The maintenance of airport pavements is an important task of a civil engineer, since the safe movement of aircr

Gts bench mark, Gts bench mark in thane district maharashtra

Gts bench mark in thane district maharashtra

Raised check rails for obtuse crossing, Raised Check Rails for obtuse cross...

Raised Check Rails for obtuse crossing In order to provide guided path way in throat portion of 1 in 8 1/2 BG obtuse diamond crossing, the check rails are raised by welding of

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd