Explain equation for change interval, Civil Engineering

Assignment Help:

Explain equation for Change Interval

y = t + v / 2a + 64.4G

Where:  y = length of yellow interval (sec)

    t = driver perception/reaction time (1.0 sec generally used)

    v = velocity of approaching vehicle (fps)

    a = deceleration rate (10 fps2 generally used) 

    G = grade of approach (percent/100)   

                         If G is positive percent or upgrade, use '+' symbol 

                         If G is negative percent or downhill, use '-' symbol


Related Discussions:- Explain equation for change interval

Doors and windows, what are the actuall windows and door dimensions e.g AN ...

what are the actuall windows and door dimensions e.g AN ND4

Determine about the pre-stressed concrete beam, Determine about the pre-str...

Determine about the pre-stressed concrete beam A pre-stressed concrete beam has a width of 200 mm and an overall depth of 400 mm. The permissible stresses in tension and compre

Explain precedence relationships - construction management, Explain the Pre...

Explain the Precedence Relationships a. Finish-to-Start - the most common, the predecessor activity must finish before the successor activity can start b. Finish to Finish

Tack rivet, tack rivet figures with connections

tack rivet figures with connections

Explain plate loading test, Q. Explain Plate loading test? In general i...

Q. Explain Plate loading test? In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of f

Geometric design of roads, Geometric Design Of Roads: Geometric design...

Geometric Design Of Roads: Geometric design of roads deals with elements such as cross-section, horizontal and vertical alignment, sight distances, lateral and vertical cleara

Ballast and sub-ballast aggregates, I want to check the grammer of report a...

I want to check the grammer of report and edit it in better sentances , reduce the Plagiarism & edit the reference to havaerd style

Surveying, tracing paper method for solving three point problem?

tracing paper method for solving three point problem?

Explain the unit hydrograph method, Q.- Explain the Unit hydrograph Method ...

Q.- Explain the Unit hydrograph Method for estimation of peak flood discharge in a river. Ans.- Unit hydrograph Method A hydrograph is a representation of hydraulic cha

Design of steel structure, design acolumn spice for column sections SC 250 ...

design acolumn spice for column sections SC 250 and SC 220 carrying a load of 500 KN

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd