Explain sedimentation, Civil Engineering

Assignment Help:

Explain Sedimentation

1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period

2. Basins are usually rectangular or circular either a radial or upward water flow pattern

3. Four zones in a clarifier

  • Inlet
  • Settling
  • Outlet
  • Sludge storage

Related Discussions:- Explain sedimentation

Design of steel lug angles with channel sections.., while designing the lug...

while designing the lug angles with the channel section what does "the force not acccounted for by the direct connection of member" mean?

Retaining walls, Retaining Walls: A wall used to retain some material ...

Retaining Walls: A wall used to retain some material on one or both sides of it can be termed as retaining wall. Commonly, it is used to retain soil at two different levels on

Explain p trap, Q. Explain P Trap? Trap is a depressed or bent sanitary...

Q. Explain P Trap? Trap is a depressed or bent sanitary fittings which always remains full of water it is water seal. Its functions are to prevent passage of foul air or gas

Diffrence between concrete road and bituminous road, Q. Diffrence between C...

Q. Diffrence between Concrete road and bituminous road? Concrete road belongs to rigid pavement and they don't deflect under traffic loads. Quite the reverse, bituminous pavem

Determine the head loss due to friction, Determine the Head Loss Due To Fri...

Determine the Head Loss Due To Friction Determine the head loss due to friction using the Darcy-Weisbach equation. The water is pumped at 3.0 gallons per minute, has a temperat

Explain the equation for length of spiral curve, Explain the Equation for L...

Explain the Equation for Length of Spiral Curve Length of Spiral Curve can be calculated using the following equation L s = 3.15V 3 /RC Where: V - Design Speed in MPH

Determine the equivalent of free float, The free float is equal to: a. L...

The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Underwater problems in bridge construction, Q. Underwater problems in bridg...

Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding

Foundation, what are factors that affect bearing capacity of a shallow foot...

what are factors that affect bearing capacity of a shallow footing

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade