Unsealed contraction joints in concrete pavement, Civil Engineering

Assignment Help:

Unsealed contraction joints in concrete pavement

For unreinforced concrete pavement, contraction joint is an approximately 3mm wide groove with a depth of about one-third to one-fourth of slab thickness and a regular spacing of usually 5m. Grooves are designed such that they are too narrow for stones to fall into when cracks are open because of the contraction of concrete. Groove location is l a plane of weakness and groove behaves as a potential crack-inducing device where any potential cracks because of shrinkage and thermal contraction can form will be confined to the base of groove. It would not cause any unpleasant visual appearance on the exposed surface of unreinforced concrete pavement.

The above-mentioned contraction joints can be designed as unsealed. These grooves are very narrow so that stones can barely get into these grooves even when joint undergoes contraction. Fine particles or grit entering into the groove are supposed to be sucked out by the passing vehicles. The joints can be self-cleansing and it may not be necessary to seal the joints for fear of attracting the accumulation of rubbish and dirt.


Related Discussions:- Unsealed contraction joints in concrete pavement

Grillage foundation, what are the advantages of grillage foundation and why...

what are the advantages of grillage foundation and why people prefers that?

Plants aeration period, Plants aeration period: Problem: What i...

Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated

Free- fall concrete placement in bored piles, Q. Free- fall concrete placem...

Q. Free- fall concrete placement in bored piles? Based on the research by STS Consultants Ltd it was found that concrete placed by free falling below 120 feet will not suffer f

Concrete pavement, Question In case of concrete pavement, why is requir...

Question In case of concrete pavement, why is requirement of 95% by mass of quartz grains are specified in contract? Answer In universal Specification of Civil Enginee

Angle measurment, calculating included angle and bearing

calculating included angle and bearing

School building, from surveying to school building finish

from surveying to school building finish

Two pegs test, the distance between two pegs M and N is 7,063 as measured o...

the distance between two pegs M and N is 7,063 as measured on a slope. the height measured on the pegs are that M=1.814M and N=0.5687M

Solid mensuration, the base of an isosceles triangle and the altitude is dr...

the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangl

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd