Which of the following statements about construction earthwork are true:
I. The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin soil.
II. The volume during transport is known as loose-measure; fluffed; swell; bulk.
III. The volume after compaction is known as compacted-measure.
IV. The change in volume of earth from its natural to loose state is known as swell. Swell is expressed as a percentage of the natural volume.
V. The decrease in volume from its natural state to its compacted state is known as shrinkage. Shrinkage is expressed as percent increase from the natural state.
Solution:Item V - "Shrinkage is expressed as percent decrease from the natural state".
Q. State different types of chlorination processes available in Railway & market for disinfect ion of water. What type of chlorine used in the above different process. What do you
Q. Minimum and maximum area of reinforcement? Minimum area of reinforcement vs. maximum area of reinforcement Beams can be designed to be larger than required for strength
What is the purpose of the gap in the road on this bridge? Ans) Purpose of the gap in the road is to permit the road to expand and contract with temperature alters without causi
Q. How to design Marginal Embankments? Design aspects of marginal embankments are similar to those of approach banks. The aspects needing special attention are dealt with below
bulking of sand
Passenger Terminal Building: Importance In a civil airport, the passenger terminal building is the centre of all activities. It services both inbound and outward boun
Question Are there any dissimilarity in methods of compaction between clayey soil material and sandy material ? Answer The three key actions of compaction are static
Assignment:-Continuous Prestressed Concrete Beam Design A cast in-place 3-span prestressed concrete T-beam is to be designed. The T-beam concsists of an 8-in thick reinforced
Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates
the two side are 17 cm and 28 cm long. and the lenght of the drawn to the third side is equal to 19.5cm. find tghe distance from an endpoint of this medianto the longest s8ide
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd