Question
Throughout concreting of diaphragm walls, three tremie pipes are used in single time. But, only one concrete truck is obtainable. How have to concreting works been approved out?
Answer
Most ideal state is to supply each tremie pipe with a single concrete truck. Though, if in case only one concrete truck is obtainable, all fresh concrete in truck have to not be placed in one single tremie pipe. With all fresh concrete located in one single tremie pipe while others left void, then because huge provider of concrete to tremie pipe, a little concrete hump may form at base of tremie pipe and it is likely that it might collapse and trap the slurry inside diaphragm walls. Therefore, fresh concrete have to be consistently shared among tremie pipes to keep away from such incidence.
An intersection has a total entering traffic volume of 42,000 vehicles per day. During the past three years, there have been a total of 35 reported intersection-related crashes.
definition of cross draunage works
Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water
what is the use of the pelton wheel
Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs
Question In designing of service reservoirs, how should reservoir floors be designed to avoid leakage of water because of seasonal and shrinkage movements ? Answer I
In case of simple bending after simply supported beam, derive that M/I = s /y = E/R.
construction of arches
help ive got my curry stuck in my hair
Question For drained reclamation, what will significance of smear zone bring by installation of band drains ? Answer Throughout installation of band drains, smear zon
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd