Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#

Related Discussions:- engineering economics

Advance structure engg, need help for assignment that requires strand 7 and...

need help for assignment that requires strand 7 and autocad

Properties a water proofing system, Q- Mention 5 essential properties a wat...

Q- Mention 5 essential properties a water proofing system should have? Ans.- water proofing system should have the following essential properties :- a) It should be im

Determine the uses of full prestressing, Determine the uses of Full Prestre...

Determine the uses of Full Prestressing A prestressed concrete structural member is said to be fully prestressed if sufficient prestresses are introduced so that  tensile stres

Foundation, The strap serves the same purpose as the interior portion of a ...

The strap serves the same purpose as the interior portion of a combined footing but is much narrower to save materials. ? The resultant soil pressure is assumed at the centers of b

Advantages associated with this kind of material, Question In pumping s...

Question In pumping stations one of choices for the material of water tanks is fibre-reinforced plastic. What are main advantages associated with this kind of material? An

Describe the consolidation settlement, Q. Describe the Consolidation Settle...

Q. Describe the Consolidation Settlement? The resulting settlements which are time-dependent and are termed consolidation settlements. After the consolidation settlements take

Workshop drawings, Workshop Drawings  (Contractor Scope) 1. Air Co...

Workshop Drawings  (Contractor Scope) 1. Air Conditioning and Ventilation Systems: Builder work drawings Enlarged scale double line HVAC System Duct & piping layouts

One-way pre stressing vs two-way pre stressing, Q. One-way pre stressing vs...

Q. One-way pre stressing vs two-way pre stressing? At the time of pre-stressing operation at one end, frictional losses will take place and the prestressing force decreases alo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd