Check rail on curve, Civil Engineering

Assignment Help:

Check Rail on Curve -

Check Rails are basically provided on sharp curves to reduce the lateral wear on the outer rail. They also prevent the outer wheel flange from mounting on the rail and this decrease the chances of derailment of the vehicles. Check Rail wear out quite fast but as these are normally worn rails unfit for main line tracks further wear of checkrails is not considered objectionable.

As per present stipulations check rails are provided on the inside of the inner rails on curves sharper than 80 on BG and 140 on MG. Minimum clearance prescribed for check rail is 44 mm for BG and 41mm for MG.

Check rail also provided either on points & crossing and level crossing having the sharpness of a degree for safety.


Related Discussions:- Check rail on curve

Necessity of pile tip cover for rock-socketed H-piles, Q. Necessity of pile...

Q. Necessity of pile tip cover for rock-socketed H-piles? In current practice concrete cover is generally provided at the pile tips of pre-bored H-piles socketed in rock. The o

Bulking of sand, what is the permissible limit of sand

what is the permissible limit of sand

Why do we need to control air pollution, Why do we need to control air poll...

Why do we need to control air pollution? a. It causes harmful effects on human health,  Materials and property,  Plants and Animals, Visibility, Global climate and others b.

Calculate the principal stresses for the state of stress, Calculate the pri...

Calculate the principal stresses for the state of stress: Calculate the principal stresses and principal planes for the state of stress shown in Figure. Figure

Compute the skin friction resistance, A 30 cm diameter pile penetrates a de...

A 30 cm diameter pile penetrates a deposit of soft clay 9 m deep and rests on sand. Compute the skin friction resistance. The clay has unit cohesion of 0.6 kg/cm 2 . Suppose

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

Project costing for Engineering success, Hi I am looking for someone who ca...

Hi I am looking for someone who can help to solve my assignment questions in a subject called project costing and I need him to continue with me until I complete this subject. I a

Rb slab, #questionshow me picture..

#questionshow me picture..

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd